My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/22/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
5/22/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:01:30 PM
Creation date
4/24/2019 11:11:17 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/22/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town ball Building Committee <br /> Iiinutes <br /> May 2 , 1997 <br /> Present: Jim Vaccaro,Ray Martini,Charles Buckingham,Bob Pox <br /> Executive Secretary Robert whritenour <br /> Assistant to the Executive Secretary Joyce Mason <br /> Guests: Roger Boit- Strekalovsky and Holt,Inc. <br /> Len Paoletta-Project Superintendent,I 'Agostino Associates <br /> Cynthia Sturges-Commurfty Development elopment Administrator <br /> Bill Hauck-Inspector of Buildings <br /> Greg Taylor-Director of Public works <br /> MeetingaUgd tQ Order by Chairman Vaccaro at p.m. <br /> Town Halt, Meeting Room 1. <br /> MM=ES-1 <br /> Jb1ffEJgL Mays,199j <br /> Motion made by Mr.Martini to approve the minutes of Thursday, <br /> y -May.. , 1997 as presented. <br /> Motion seconded by Mr. Buckingham. <br /> Y_Q1E: Unanimous. 4-0. <br /> REPORT-OF-THE ARCFHTECT-+ <br /> Roger Hoit, Project Architect for the Town Hall renovation/restoration project <br /> reviewed the final-project issues required for completion. As noted,the general <br /> punch list of interior items outstanding is near final completion. <br /> Mr.Holtwill address the interior code requirements with Bill Hauch, Inspector <br /> of Buildings by the date of Wednesday, May 28, 1997_ <br /> Exterior site conditions to be addressed by l 'Ago tixro Associates include, <br /> the disturbed areas around the perimeter of the Town Hall Building and rear <br /> lawn area disrupted during the general con tructi n process. <br /> General exterior site painting is scheduled to begin this weekend. The replacement <br /> or repair of outside facia boards will be determined during this phase of <br /> the project scope. <br /> As noted, all brick areas that contained fight fixtures that will not be replaced,will <br /> be repaired by the general contractor. <br /> Discussion followed with regards to the exterior rails to be installed around the <br /> exposed lower levels windows. Mr. Hoit recommended the Committee authorize <br /> the installation of a 3'rail c6ns'tsfing of a 2x4''heaver gauge vire and mesh to <br /> conform to building code requirements. *Approved. All areas will be painted <br /> gray to match the exposed exterior wali of the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.