My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:00:52 PM
Creation date
4/24/2019 11:12:53 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Town Hall Building Committee <br /> Minutes <br /> June 4, 1997 <br /> CQMMMTY--D,—EYELO—PhffM-UP <br /> Cynthia Sturges, Community Development Administrator <br /> gave an update to the Committee with respect to grant compliance <br /> issues against CERC ,, a sub-contracting painting firm that <br /> warranted additional review. <br /> Mrs. Sturges indicated that the matter has not yet been fully resolved. <br /> Funds earmarked for the Town Hall portion of the handicap accessibility <br /> grant will not be released until this matter has been fly resolved. <br /> In other business, the Committee received a demand for direct <br /> payment from The Cheviot Corporation dated May 15, 1997. <br /> Payment in the arnount of$26,200 was requested for materials and <br /> labor to date. The Cheviot Corporation installed acoustical the <br /> ceiling in the newly renovated Ton Hall facility. <br /> REFQRT OF TBE ARCFHIECT/GENERAL CQNIRACi <br /> J <br /> Roger Holt,Project Architect and Len 1 aoletta, Project Superintendent <br /> g <br /> were present to discuss the status of the Ton Hall construction project <br /> with members of the Town Hall Building Committee. <br /> Chairman Vaccaro indicated that most of the interior site punch list <br /> items have been completed to date. The two main items of concern _ <br /> include the basement for use as active storage, and the clewing of the <br /> exterior brief. <br /> Mr. Vaccaro requested that filler material he installed to cover the <br /> gap between the stairway as noted in the initial punch list of May 1, 1997. <br /> Discussion followed with regards to the HVAC system. Mr. Holt <br /> indicated that he will famish documentation to the Town relative to <br /> the operational procedure for the heating and ventilation system.. <br /> The project engineer and a representative from the heating firm Va'11 <br /> conduct a complete systems demonstration indicated Mr. Holt. <br /> Mr. Martini, Mr. Hauch and Mr. Taylor were requested to he present <br /> to discuss the as hunts, and general maintenance and operation procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.