Laserfiche WebLink
Page 2 <br /> Town Fall Building C:onumt ee <br /> llrlinutes <br /> April 30, 1997 <br /> UNCI LIST RE=DS, (continued) <br /> W.Holt was directed by the Committee to further review the HVAC <br /> systems contained in the newly renovated facility, and demonstrate <br /> proper operating procedures with Ray Martini. <br /> In addition,W. Ioit was requested to complete a walkway from the <br /> rear entrance door to the paved area, and repair the outside wall located <br /> in the area of the new exit stairy. <br /> The basement storage area is another matter for resolution. <br /> W. I Boit was also directed to obtain ice quotations for the installation <br /> of a wireless sound system for Meeting loom#I. <br /> REP <br /> .ORT__OF THE AR-=CT. <br /> W.Holt indicated that job construction remains on schedule. The cleaning <br /> of the exterior of the building is anticipated to begin next week. All <br /> painting will commence thereafter. <br /> It was noted that the paving elevation in the area of the former portable <br /> unit has a grade variance of 7-12". The Department of Public Works <br /> will install two drainage basins. W. 'alor recomnnended that a dense <br /> grade of gravel be used in this area opposed to leveler course ashphalt* <br /> Discussion followed with regards to the final coat of asphalt:pavement. <br /> Mr. Paoletta was directed by the Conunittee to coordi <br />