My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/16/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
1/16/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:02:33 PM
Creation date
4/24/2019 11:38:34 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/16/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> ProjectRepresentative's Daily a ort Page I of 1, <br /> Report N . <br /> Date: 119197 <br /> Architect: Stre aloysky bolt, Inc Day-, TH <br /> Project: Mashpee Town Hall Contractor "Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Noon: Cloud Pi1J'!: <br /> Temperature: 8:00 Ally Noon: 36 4PM: <br /> PERSONNEL]NEL CO T Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> 'Agostino 1 glob Supt. <br /> Subcontractors: <br /> Ceiling 2 <br /> Electrical <br /> Plasters 1 <br /> Tile <br /> Mechanical 2 2 <br /> Sprinkler 2 2 <br /> Site - ' - - - - ---- t- - ----- <br /> 7 <br /> Controls 2 <br /> TOTAL 20J <br /> Notes: Glazing has been installed in interior doors and side lights. <br /> Light fixtures installed in offices and corridor on first level <br /> Ceiling grid being installed in main entry. <br /> Ceiling and lighting installed in main meeting roam. <br /> The metal doors in building have been primed. <br /> Fire extinguisher cabinets installed(no extng. <br /> Counter tops installed in ground level <br /> Ceiling the installed on ground level along with some light fixtures. <br /> Window trim and sills have been and are being installed on ground and first levels. <br /> Sprinkler heads installed anal being installed on ground leveL <br /> Stair 1#2 treads and risers have been repaired. <br /> Site meeting held at 2:30 pm concluded at 4:40 pm with small group that dial walk <br /> through. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Va6stions from plans and specs.,instigator,action <br /> .Work items or extra started taker,contrs.seeking compen., item, labor and <br /> .Work items or extra completed materials <br /> 15.Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13.Arterial and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> B.Testing or inspection 14.Work not meeting specificatio s <br /> g. Equipment on site 15.Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.