My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:05:14 PM
Creation date
4/24/2019 1:27:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Page 2 <br /> Town Hall Building Committee <br /> Minutes <br /> July 16, 1996 <br /> REPQRT OF ARC.T r- <br /> lir.Hoit recommended the Committee consider phasing a portion of <br /> Alternate#3 into the project scope upon site excavation. The sum <br /> o $5,500 will provide conduit to the interior of the building to <br /> support an emergency generator for the Town Hall. <br /> Site excavation is anticipated to begin in three weeks. Mr.Hoit indicated <br /> that incorporating a portion of Alternate#3 into the project scope will <br /> represent a cost savings to the Town and alleviate additional re-paving <br /> in the future. <br /> In addition,the Committee discussed Alternate#1,the future expansion <br /> of the second floor, and Alternate##2, the base work necessary for a <br /> fire suppression system. <br /> Mr.Hoit will further discuss the project alternates with the Conrnnnittee at the <br /> next scheduled meeting. A recommendation will be presented <br /> to the Board of Selectmen on Monday,July 29, 1996. <br /> CHANGE, RDER#31 <br /> Mr.Holt presented Change order#3 to the Goatee for review and <br /> approval representing the following additional services: <br /> Installation of telephone line to new electrical location: $ 4t6OO.00 <br /> Site excavation,repair,concrete repair,paving $2,500 <br /> Electrical service,conduit to computer room $2,100 <br /> (tentative schedule: NYNEX- /22/96 AT&T-7129/96) <br /> Installation of temporary panel to computer room: $ 925.00 <br /> Repair of roof drains improperly piped: $ 4,930.00 <br /> Demolition,plumbing,pipe hangers,repair <br /> (Plumbing code violation) <br /> Total Change Order : $10,455.00 <br /> Motion made by Mr. Martini to approve Change order ##3 <br /> as presented in the amount of $10,455.00. <br /> Motion seconded by 11th. Buckingham. <br /> YOTE: Unanimous. 3- . <br /> Change order#1: $157640.00 <br /> Change order#2: 13,300.00 <br /> Change order#3,-. $10,455.00 <br /> Total; $39,395.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.