Laserfiche WebLink
Page 3 <br /> Town Hall Building Commi*tree <br /> Minutes <br /> October 16, 1996 <br /> REPORT OF,THE ARCHITECT: <br /> In other business, lir. Hoit received correspondence from the Building <br /> Inspector dated October lo, 1996 relative to some questionable construction <br /> issues. (enclosed) <br /> NIr.Hauck addressed matters relative to steel construction work,roof <br /> beams, and steel studs for the door frames. He requested the#entire building <br /> be made weather tight, and thoroughly dried prior to the installatior,.of <br /> further insulation or sheet rock. <br /> In response, Mr. Hoit presented a memo to Mr. Hauck addressing all <br /> construction issues of concern. The structure will be installed in accordance <br /> with all building specifications stated W. Hoit who suggested the <br /> General Contractor,Architect and Building Inspector maintain an open <br /> line of communication. <br /> copy of Mr. Hon's response memo will be forwarded to the Committee <br /> for review. <br /> NEXT SCHEDULED MEETING: <br /> Wednesday, October 3 , 1996 <br /> 1:00 P.M. <br /> Town HaH Conference Trailer <br /> ADJOURNMENT- <br /> Motion ion made by Mr. Martini to adjourn at 1:40 p.m. <br /> Motion seconded by Mr. Buckingham. <br /> VOTE: Unanimous. - . <br /> The Conurttee conducted a tour of the facility. <br /> Respectfully submitted, <br /> 1-c) � . Au ov� <br /> Kathleen M. Soares <br /> Board Secretary <br />