My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M <br /> ProjectRepresentative's Daily Report Page I of <br /> Report No. 8 <br /> Date: 1212196 <br /> Architect: strekalovsky&Hoit Inc. Day: <br /> Project: Mashpee Town Hall Contractor "Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: : o AM Rain Noon: Cloudy PM: <br /> Temperature: 8400 AM so Ikon: 50 4PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen en Helpers Total <br /> General <br /> Contractor: <br /> 'Ag stino 1 .Joh Supt. 6 2 <br /> Subcontractors: <br /> Plasterers 3 3 <br /> Masons 2 <br /> Pipe <br /> Fire Protection 3 3 <br /> Elevator 2 2 <br /> Electrical 4 <br /> Paint 2 2 <br /> Ceiling 1 9 <br /> TOTAL 301 <br /> Notes: Plasterers working in cor idor on first level. ceiling grid being installed in employee <br /> lounge on first level. Elevator structure being assembled. sheet rock and insulation <br /> being Put up in main meeting room. Unit gents being installed on first level. Painters <br /> applying first coats to door frames and walls. One of the three skylights have been <br /> installed over entrance. Masons doing infill on areas inside building. Mr. Paol tta <br /> had a question on smoke detectors in attic storage space. Electrician says location <br /> is too low. Writer spoke with.Jeanine Delongchamp and OKV electrician to put <br /> smoke detectors in Peale area with enough wire to relocate in the event that the <br /> Town Hall occupies that space. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking comp n.,ft m,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remark <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to sped. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment an site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.