My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Project Representative's entative's Dally Report Page I of 7 <br /> Report No. 8 <br /> Date: 1213196 <br /> Architect: Strekalovsky&Holt, Inc. Day: T <br /> Project: Mashpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Noor: Sunny 4PM, <br /> Temperature: :oo AM Noon: 46 PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D'Agg stino I .lob Supt. <br /> Subcontractors: <br /> Paint 2 2 <br /> Sheet Metal <br /> Fire Protection <br /> Electrical <br /> Plasterers <br /> Masonry 2 <br /> Elevator 2 <br /> Ceiling 1 1 <br /> TOTAL 28 <br /> Notes: Painting on first level corridor. Ceiling grid being installed on first leve/offices. <br /> Remaining two skylights installed at rain entrance. sleet rock being installed <br /> in main meeting area. Mork in lower storage area ongoing. Taping and skimmings <br /> of joints and screw proles in snails meeting area. Electricians running leads in lower <br /> level. Pipe fitters installing branches on lower level. <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> 2.Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> .fork items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specification <br /> .Equipment on site 15.Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.