Laserfiche WebLink
I <br /> Project Representative's entative' il Report Page I of <br /> Deport No. 86 <br /> Date: 121,5196 <br /> Architect: strelralovs y&Holt,Inc. Darr: TH <br /> Project: Mashpee Town Hall Contractor D"Agostino #ssoclates <br /> Superintendent: Len Po Jetta <br /> Weather: 8:00 AM Noor: PM: <br /> Temperature: 8:00 AM Noon: PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> "A grostin o I .lob Supt. <br /> Subcontractors: <br /> Steel 2 2 <br /> Plumbing 1 <br /> Heat Pipe <br /> Electrical <br /> Fire Protection 2 2 <br /> Plasterers <br /> Masons 2 2 <br /> Elevator 2 2 <br /> Paint <br /> Tile Ceramic 9 <br /> Ceiling <br /> TOTAL 271 <br /> Cotes: Painter working on first level. Ceramic file being installed on first level bathroom. <br /> Elevator installation ongoing. AflJoints and screen holes taped and skull coated <br /> in main meeting area. Window installed on front of building. sheet rock being <br /> installed on ground floor. Metal fascia installed on perimeter of flat roof arrears. <br /> Steel workers working on ground floor installing steel beams. <br /> 16 <br /> Number Ivey to fnspecUonNotes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.M tectal and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specificatio <br /> .Equipment on site 15. Items in 14 not corrected. <br /> Copies t : Staff Signed: dp.. <br />