My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/1995 TOWN HALL BUILDING COMMITTEE Minutes
>
12/13/1995 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:10:30 PM
Creation date
4/24/2019 2:53:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/13/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.t <br /> Page l <br /> Town HaH Building Committee <br /> Minutes <br /> December 13, 1995 <br /> Present: Jim Vaccaro, Ray Martini, Charles Buckingham, Bob Eo <br /> Robert Whritenour, Joyce Mason, Bill Hauck <br /> Guests: Roger Molt,Jeanine Delongchamp, Mike Hickey <br /> Meeting Called to order by Chairman Vaccaro at 2:00 p.m. <br /> MINUTES: <br /> Wed nesday, vember-29, 1995: <br /> Motion made by lir. Martini to approve the minutes of <br /> Wednesday, November 29, 1995 as presented. <br /> Motion seconded by Mr. Buckingham. <br /> V : Unanimous. -0. <br /> Mr. Fox abstained. <br /> SCH MATfC DESIGN REVIEW AND APPROVAL. <br /> Motion made by Mr. Buckingham to approve the <br /> schematic floor design and layout of the Town Mall <br /> Building renovation restoration project as presented. <br /> Motion seconded by Mr, Martini. <br /> YOTE: Unanimous. -o. <br /> 1 r, Vaccaro will present the schematic design to the Board of Selectmen <br /> on Monday,December 18, 1995 for review and approval. <br /> REPORT of....THE R CHTMCT: <br /> Mike Hickey, Project Engineer was present to discuss the components <br /> of the beating and ventilation system with members of the Town Nall <br /> Building Committee. <br /> Mr.Hoit recommended the two pipe fan cooled system as the <br /> preferred heating and ventilation option. It was noted that each room will <br /> contain a thermostatically controlled unit that can easily be set to a <br /> controlled temperature system. <br /> Discussion followed with respect to plumbing, electrical and fire <br /> protection options for the Torn Hall facility. <br /> With regards to data transmission, Mr. Hoit will discuss computer <br /> specifications with Paul Keefe, the Computer-Consultant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.