My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/22/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
07/22/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 5:05:58 PM
Creation date
8/2/2019 1:58:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
07/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�`�•r011'N Ur, <br /> 'S ••R A�' Y <br /> � Vown o Mash 9 Ifee Departwnt o Pub(ic Works <br /> 3550 Meetinghouse Road <br /> Mashpee, Matesachusetts 0264.E <br /> Tefe hone w 508 539-1420 <br /> FaX m (508)5539-3894 <br /> MEMORANDUM <br /> July 15, 2019 <br /> TO Board of Selectmen <br /> Rodney Collins, Town Manager <br /> z <br /> FROM: Catherine Laurent Directory n <br /> RE: Recommendation for Award of Contract for Pre-engineering Storage Garage for <br /> DPW <br /> Description <br /> The Town received one bid in response to the RFB issued for construction of a 42.x60 foot <br /> storage garage at the DPW. The bid was from Collins Construction Co., Inc. in the amount of <br /> $174,050 total (base with Alternative #1). <br /> Background <br /> The FY19 Capital Improvement Plan approved at the May 2018 Annual Town Meeting included <br /> $125,000 in funding fora storage garage at the DPW. The garage would be used for storage of <br /> small DPMI equipment (chippers, tractors, and similar). <br /> An RFB was first issued on April 3, 2019. No bids were received in response. <br /> A second RFB was issued on May 8, 2019. one bid was received in response from Collins <br /> Construction Co., Inc. in the amount of$202,804.00. This bid was rejected with the expectation <br /> that issuance of a subsequent RFB might draw more bids. <br /> The third RFB issued on June 12, 201.9 again only received one response,though the bid, from <br /> Collins Construction Co., Inc., was less at$174,050 total. <br /> Recommendation <br /> I recommend that a contract be awarded to Collins Construction Co., Inc., accepting Bid <br /> Alternate#1, for a total contract amount of$174,050.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.