Laserfiche WebLink
7/29/2019 <br /> 2017/101.9_.SWMS......C, y Reauest;o__ <br /> Asked the towns and JBCC to make Capacity Requested over Long-Time <br /> capacity requests for "Study Basis" (Annual Average Basis) <br /> * Short-term,Mid-term and long-term 6'0 <br /> i <br /> 5.5 <br /> Sewage, Septage and Effluent F <br /> 5.0 .—.._..__..._.-...-.......------ -------------------------------------._._w........__....-_---- <br /> _ _u.�w.__.-... --- - --- •....._.. ......................._._. <br /> Study Basis Capacity 4.55 mgd 4.55 <br /> 4.5 ---.... ----------- _ —— --- _ <br /> Study Basis <br /> 4.t] <br /> e <br /> g } <br /> Bourne effluent and sews � <br /> Falmouth(effluent) 3.0 <br /> 3 <br /> Mashpee(sewage) U_2.5 .--- 2.40 <br /> 2.2a 2.14 <br /> Sandwich(sewage) Current Permitted <br /> Capacity 0.36 i-3"td <br /> �a <br /> Barnstable{sewoge} 1.5 <br /> 4.93 <br /> 1.0 _.-._...._ .� _. <br /> .� <br /> Ke v Conclusion 0.14 0.00 0.14 <br /> 0.0 <br /> c� Significant capacity expansion Existing Mid-Terre Long-Term <br /> needed to meet the identified —10 years 20 to 40 years <br /> needs Treatment&Disposal Disposal Only ®Total Disposal <br /> WRIGHT-PIERCE. <br /> tn�inrrrin�a @vkter Cnsi��nnsrnl Jr <br /> vu.% Legend <br /> JBCC>M <br /> f�PA T} <br /> 's <br /> p <br /> JBCC wastewaterSystem0 <br /> ... .....g., <br /> JBCC Mtr <br /> a <br /> 4SVYfFa�s 5.�n?�'�c <br /> h <br /> %V!IF a Mztqm <br /> • <br /> 0 k+ <br /> t <br /> AN <br /> a mDu h$5 VrVY1 <br /> Force/ MA G <br /> Owned b Air U5 <br /> 1 <br /> WAFNA- yWnT�e <br /> 36 miles of sewer on B;, <br /> a s <br /> AMeftert Forte Main <br /> 11 Pump Stations EM j8CC notniary <br /> sacc c� tom,s,�:rrn <br /> 0.36-m d W'IIWTF annual average (AA) x3 t1LV�S3rae(Ptc�MemTr�>n�xjA�sa} <br /> y <br /> _ Current flows 0. 4-m <br /> g <br /> d AA <br /> 4 <br /> 1 milesIffluen <br /> t Forcemain <br /> B UF NDW1CH <br /> 1 <br /> 03 <br /> md Rapid Infiltration Basins <br /> AA <br /> Ke Conclusions <br /> * Adequate land available for treatment RNSTABLE <br /> * Effluent disposal is the principal constraint -� <br /> Without significant additional effluent <br /> MASNPfF <br /> disposal capacity,the potential for a JBCC <br /> SWMS is limitedALMo►n, <br /> Shared Wastewater Manaxement Sludy <br /> 11§tt ftstrriter S7r+pern <br /> WRIGHT-PIERCE <br /> Enginre?n A A 0Kite l Imil&V nit!nl <br /> a R•t� sacs Leda! ,�'WRIGHT-PIERCE uat: <br /> A iwas;� �ari 1-1 <br /> 3 <br />