Laserfiche WebLink
cc Estuary short-term (ongoing) intensive"grater quality <br /> and shellfish quality monitoring to check near- <br /> term <br /> earterra performance following MEP established protocols for estuary water quality and health. <br /> 00 EP flushing and stream gauge monitoring necessary to update MEP T l L compliance points. <br /> 00 Grou nid a er/drinking water supply quality. <br /> CO Groundwater mounding analysis through localized remodeling. <br /> Lo,ng Terms 'lonitorin and Mo,delin <br /> CO Each of the existing and proposed treatment facilities that have MassDEP groundwater discharge <br /> permits have various monitoring requirements (including but not limited to). <br /> Daily monitoring of flow, pH, disinfection, and turbidity. <br /> — Weekly/monthly monitoring of flog, biochemical oxygen demand (BOD),, total suspended <br /> solids (TSS), total nitrogen (TN),, and possibly total Phosphorus (TP). <br /> Groundwater monitoring well data (typically quarterly); upgradient, and dawn gradient of <br /> recharge facilities. <br /> MEP estuary monitoring and modeling (land and hydrodynamic). <br /> TMD,L Compliance. <br /> Long-term of standard MEP grater quality.parameters. <br /> Eel grass surveys typically provided by MassDEP. <br /> - Benthic habitat surveys if required).. . <br /> Shellfish/Estubry Monitoring: <br /> Long-term compliance monitoring performed following the same MEP protocols to measure <br /> estuary health. <br /> - Shellfish monitoring in compliance with Division of Marine Fisheries DMF' requirements <br /> depending on end use of shellfish. <br /> Sample analysis including shellfish physical characteristics (length, weight, etc.) and nitrogen <br /> content <br /> CO Groundwater quality monitoring through existing drinking water supply wells as required by <br /> MassDEP and Environmental Protection Agency), and groundwater monitoring wells as required <br /> by groundwater discharge permits issued byMassDEP'for wastewater treatment facilities). <br /> more extensive list is provided in Chapter 10. <br /> ES.6.2 Compliance Reporting <br /> As part of the Implementation of the plan, each implementation phase will be incorporated into a <br /> compliance document related to, l ashpee's efforts in achieving the TML '! s. Depending on the <br /> requirements established by the regulators, this document may need to reference or be referenced by the <br /> neighboring communities as part of their compliance reporting. This document, which will need to be <br /> negotiated with the Town, District, and associated regulators, would therm be available to MassDEP, DMF, <br /> Coastal Zone Management I 'l l , MEP, CCC, neighboring communities, and other agencies as so <br /> identified in that effort. <br /> 81612001.4 Town of Mashpee Sewer Commission ES-1 I <br /> Final Recommended Plan 1 Final Envitonrriental Impact Report <br />