Laserfiche WebLink
7/29/2019 <br /> ...................... <br /> Asked the towns and JBCC to,make Capacity Requested over Long-Time <br /> capacity requests for "Study Basis" (Ann,ual Average Basis) <br /> Short-term,Mid-term and Long-term 6,0 ........ <br /> Sewage, Septage and Effluent 5.5 <br /> 5,o ------- <br /> 4.5 4,55 Study Basis Capacity 4.55 nig ------ <br /> Study Basis <br /> 4,01 ...... ......... <br /> Bourne(effluent and sewage) <br /> U3.5 ......... ............. <br /> Falmouth(effluent) E <br /> �:3.0 .......... ............ <br /> 0 <br /> o Mashplee(sewage) U:2.5 - —----------— ........ 7u 2.40.,_ <br /> 2J4 <br /> "I R <br /> 0 w <br /> Sandwich(seage) 2.0 Current Permitted <br /> Capacity 0.36 mlgd <br /> Barnstable(sewage) 1_9 <br /> ................ .2,6. <br /> .93 <br /> 1.0 <br /> 0.5 ...... ....... <br /> ,�Key Conclusion 1� 0.14 0.00 <br /> U J am J <br /> 0 Significant capacity ex�pansion Existing Mid-Term Long-Term <br /> needed to meet'he identified —10 years 20 to 40 years <br /> needs M Treatment&Disposal Disposal Only IM Total Disposal <br /> WRIGHT-PIERCE <br /> S <br /> DZU atmW tam C4ille t4A Con-44m W45 D*e,0"*4r-.4Mn I Wd Legand <br /> Jill <br /> ,SO C.`Efte-d DiSW.W <br /> M <br /> PLYMOUTH <br /> * Owned by US Air Force/ MA ANG Fal?n6u'llh BOA,VIV47F <br /> WAREHAM <br /> * WeI inSwae <br /> * 36 mi'les of sewer B"*tjIM1111 <br /> A CC Envoit raw VA n <br /> I I Pump Stations M Acr.SxnIarj <br /> 0.36-mgd WWTF, annual average (AA) WS ARuerve(lbAhXMTrjh�V AtZ3) <br /> 0 Current flows-0.14-mgd,AA <br /> 11 miles Effluent Forcemain WICH <br /> DOU E <br /> 0.36-mgd Rapid Infiltrat'l6n Basins, AA <br /> Key Conclusions <br /> Adequate land available for treatment I ANI <br /> 0 Effluent disposal is the principal constraint <br /> c, Without significant additional effluent <br /> disposal capacity,the potential for a JBCC <br /> SWMS'is limited <br /> Shat*d wastewtof rolanarefftent Sludy <br /> WRIGIAT-PIERCE <br /> M1 loll <br /> PIERCE <br /> 3 <br />