Laserfiche WebLink
MINUTES November 7 . 1991 6 BOARD. of FIAT <br /> ' The first 3 1/21 of soil is unsuitable. Soils will be re- <br /> moved V into the right-of-way, " <br /> Mr. Greelish questioned Mr. Michniewicz as to whether he <br /> has been authorized to remove soils from the right-of-way e <br /> Mr. michniewicz responded, he is researching the matter. <br /> Mr, McQuaid recommendation the Board. approve variance <br /> requests with the stipulation a Health Agent inspect soil <br /> conditions at the tete of the installation of the flow dif- <br /> fusers on the Beach Road side as there is a strong possibil� <br /> ity that fill in that area may be clean and permeable. <br /> Mr. Greelish motioned to grant a 1501 variance from the <br /> local Coastal Dune requirement and state variances from the <br /> following Title V requirements: Section 1 . 1 , Section <br /> 15.03(7). and section 15.13(8) with the stipulation the engi- <br /> neer at a pt to relocate the leaching facility closer to the <br /> dwelling thereby maintaining a lo' separation to the street, <br /> otherwise a Health Agent arta the Engineer are to verify soil <br /> conditions at tho street line for permeability to avoid <br /> strip-out, Mt. Costa seconded, <br /> 10, Notice of SEM SS meeting,,,_.._.. 11Z8 Mr. McQuaid in- <br /> formed the Board he will attend the meeting <br /> 11. Memo from D.P. T. re:.-.- Access to landfill - Board mem- <br /> bers agreed to the request. <br /> Mr, Costa directed Mr. McQuaid to informs the D.P.W. Di- <br /> rector that Health Agents ar.e ;to monitor all brush disposal <br /> at the landfill ort Thursdays. � 3 � <br /> 12, E Letter, ani from ,Q, .D. re: Lead paint at the <br /> Davis school - Mr.. McQuaid informed the Board paint chips <br /> from the exterior f the school{ w'er' e found�t contain lead, <br /> "The contractor- and custodians were given literature on pro- <br /> tection against load paint removal. "The Contractor did not <br /> fully cooperate witli paint remb'val procedures,, " Mr. McQuaid <br /> stated has questioned the County as -to whether paint from the <br /> interior of the school should be analyzed for lead. #lDr. <br /> DeMoura did agree to comply with State requirements, " "A <br /> deleading contractor has been retained to perform the <br /> cleanup." <br /> Acknowledged.. <br />