My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
09/09/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 5:28:31 PM
Creation date
9/11/2019 11:22:06 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
09/09/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T'I'ghe&Bond <br /> Engineers 1 Environmental Specialists <br /> 22-1170-15 <br /> uly 19, 2019 <br /> Ms. Catherine Laurent, Director <br /> u <br /> bias pee Department of Public Works . <br /> 350 Meetinghouse Road <br /> iashpee, MA 02649 <br /> RE M,ashpee Stormwater Management Program <br /> Dear Catherine, <br /> Tighe & Bend is pleased to provide you with this proposal and agreement to continue to <br /> assist the Town of l ashpee in meeting the requirements of the U.S. Environmental. <br /> Protection Agency's (EPAs) National Pollutant Discharge Elimination System iPDES Phase <br /> II Stormwater Program. <br /> Mashpee has requested a proposal for assistance in meeting permit requirements for 'i '2 , <br /> considered to he Permit Year 2 under the General Permit. Requi-rements under the General <br /> Permit for Perm-it Year 2 a,-re listed below-, <br /> • Distribute Public Education Messages (requirement will-he met through the posting of <br /> public education messages on the Town's rehsite <br /> • Distribute materials to dog ornery on proper pet waste management during issuance <br /> or renewal_ of dog licenses <br /> • Provide opportunity for public participation in review -and implementation of SWMP <br /> requirement will he met through presentation at Board-of Selectmen meeting <br /> Complete a written catchment investigation procedure <br /> Begin investigation of catchments associated with Problem Outfalls <br /> Annually train ,staff on IDDE <br /> Complete`Phase " system mapping <br /> Update post-construction stormwater hyla and_ include requirement for neer <br /> development„and redevelopment BMPs to l e orptirnized for nitrogen removal <br /> Develop an inventory and written operations & maintenance procedures for all Town- <br /> owned parks, open space, buildings, facilities, vehicles and equipment <br /> Clean catch basins <br /> Sweep streets two times per year <br /> Inspect all municipally awned mapped stormwater treatment structures <br /> Implement printer road maintenance program <br /> Cover or enclose salt piles <br /> Develop a written Storm titer Pollution Prevention Plan + ,SWPPP <br /> "rack existing or installed ,structural BMPs and document estimated nitrogen removal <br /> 4 Barlows Landing Road,Unit 41.5 Pocasset M,02559 Tel 5 8.5 4.728 <br /> "ywji h bon.. om <br />
The URL can be used to link to this page
Your browser does not support the video tag.