My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/14/2019 ZONING BOARD OF APPEALS Minutes
>
08/14/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2019 5:04:40 PM
Creation date
9/16/2019 2:59:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 14,2019 <br /> The initial plan depicted that there would be 0% of the undisturbed natural area. It was <br /> intended that the entire area around the site would be landscaped and improved. However, <br /> after the applicant consulted with Attorney Kirrane, he suggested that would not be <br /> received well by any Board who has the authority to grant relief under this particular <br /> section of the bylaw. The request before the Board is now 26% of undisturbed open space <br /> on this project, seeking 14%Variance relief from the Zoning Board of Appeals. <br /> Attorney Kirrane said his client, Cape Cod Coffee does not own the building that they <br /> currently occupy on Main Street. He said his client is proposing to expand his business and <br /> provide more venues for the public. There are two lots in the front of this development that <br /> is situated in the C-3 Zoning District. This particular lot consists of almost 76,000 sq. ft., <br /> and has the appropriate frontage along Evergreen Circle and Rte. 130. This particular lot is <br /> also under the Light Industrial Overlay District which is listed in the table of uses under <br /> §174-31, and the accessory uses that are referenced in the Light Industrial Overlay District <br /> under §174-45.6. These are the types of uses that can be combined with an industrial use <br /> and other miscellaneous types of uses whether they are commercial in connection with the <br /> development in this particular overlay district. <br /> Attorney Kirrane mentioned that Evan Lehrer, Town Planner authored the bylaw for this <br /> particular Light Industrial District which invites some of the types of business that are <br /> coming into Town, and are being adopted by other Towns along Cape Cod. Attorney <br /> Kirrane listed some of the specific purposes and intent of this zoning district in his written <br /> remarks. In order to accommodate those types of uses which are multifaceted, there is a <br /> built-in conflict between the C-3 Zoning District 40%natural undisturbed areas. The intent <br /> of the bylaw for uses within the Light Industrial Zone is difficult to develop viable projects <br /> that meet the objectives of the Light Industrial Zoning District and still be tied by that 40% <br /> requirement that only relates to the two front lots as discussed earlier. Everything behind <br /> these two lots do not have any kind of requirement to this undisturbed open space. <br /> As Attorney Kirrane mentioned to the Board his client is seeking relief to allow 26% of <br /> this lot as undisturbed open space. The topography on the site plan shows a significant hole <br /> in the right front corner of the lot facing Rte. 130. His client wants to fill and landscape <br /> that topographical feature by removing the undisturbed vegetation. There will be people in <br /> and about the proposed building, and the outdoor seating, etc. Jan is concerned that if <br /> anyone wondered over to that area they could find themselves at the bottom of that hole. <br /> So as far as a safety and liability point of view, he is seeking to fill in that hole, and after <br /> he fills it in, he will landscape it in a tasteful fashion that will be compatible with other <br /> indigenous growth that exists. <br /> The second item that was discussed earlier is the vegetative drainage basins and swales. <br /> The plan that has been provided depicts a vegetative drainage and swale on the site which <br /> represents about 6% of the naturally vegetative area on the project. So between the hole in <br /> the front, and the natural vegetative area where the drainage basin and swale will be, there <br /> is 14%undisturbed area.In addition,there will be more parking spaces requested than what <br /> the bylaw requires. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.