Laserfiche WebLink
CONSERVATION COMMISSION MEETING <br /> DOCUMENTS LIST <br /> September 12, 2019 <br /> PRE/POST ITEMS 6:00 P.M. <br /> Item Documents <br /> Approve Minutes August 8, 22, 2019 <br /> Lopez Conservation Land Swap Request for Town Counsel assistance <br /> 110 Popponesset Island Road: discussion Violation <br /> Evergreen Circle Finalized, recorded deed <br /> Vote: Chairman, Vice Chair, Secretary <br /> Discussions: Upper Quashnet Restoration <br /> Project. Wetland forum/field training with DEP <br /> Wild About Estuaries Event September 14'h flyer <br /> PUBLIC HEARINGS <br /> Owner/Address Documents <br /> 6:00 Paul & Jamie Saganey Notice of Intent application. Andrew Garulay of <br /> 28 Jeep Place Yarmouthport Design Group Mitigation Narrative and <br /> Landscape/Mitigation Area/LSCSF Compliance <br /> Landscape Plan with revised date: August 15, 2019. <br /> BSS Design narrative and plan: Plot Plan — Existing <br /> House, Proposed House with revised date: August 15, <br /> 2019.Continued from 6127, 7125, 818, 8122 for revised <br /> plan reducing impervious surface area <br /> 6:03 Frances Pennell Notice of Intent application, JC Engineering narrative <br /> 76 Triton Way and plan: Proposed Site Plan. Date: August 15, 2019. <br /> Elaine M. Johnson Landscape Design mitigation <br /> narrative and plan: Draft Proposed Site Plan. Date: July <br /> 30, 2019. Continued from 8122 for revised plan <br /> minimizing footprint of pool and detailed mitigation <br /> plan. <br /> 6:06 Steven D. & Michele H. Herwald, LLC Notice of Intent application, Falmouth Engineering <br /> 2 Summersea Road narrative and plan: Site Plan— Dock Reconstruction. <br /> Date: July 30, 2019. Continued from 8122 for detailed <br /> mitigation plan. <br /> 6:09 Pirates Cove Beach Association, Inc. Request for Determination of Applicability and plan: <br /> 0 Mutiny Way Mutiny Way Road Work. Date: 8/22/19. <br /> 6:12 Gregory R. & Hillery Lee Request for Certificate of Compliance 43-2954, copy of <br /> 11 TaffraiI Way Recorded Order of Conditions, copy of plan of record: <br /> Dock and Dredging Plan, dated February 9, 2018 and <br /> letter from Cape & Islands Engineering stating that"the <br /> project has been substantially completed according to <br /> the plan of reference". <br /> 6:15 RRK Realty Holdings, LLC BSS Design request for one year extension of Order of <br /> 27 Aunt Janes Road Conditions 43-2832 and letter stating that"The house <br /> plans are being revised to suit a new buyer". <br /> 6:18 Frank J. & Mildred M. larossi Falmouth Engineering, Inc. request for Certificate of <br /> 74 Waterway Compliance, copy of plan of record and letter stating <br /> that "the work has been performed in substantial <br /> compliance with the Order of Conditions". <br /> 6:21 Reissue OOC 43-2975/55 Palmer Road Order of Conditions <br />