My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/19/2019 SEWER COMMISSION Minutes
>
09/19/2019 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:00:22 PM
Creation date
10/23/2019 10:33:45 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Sewer Commission Minutes 9/19/19 <br /> 16 Great Neck Road North, Mashpee, MA 02649 <br /> Mashpee Town Hall, Ockway Meeting Room <br /> Attendance: <br /> Members:Tom Fudala, Ken Dunn, Brad Pittsley <br /> Public: Rick York, Glenn McCarthy, David Long,Anastasia Rudenko, Lenna Quackenbush <br /> Convene time: 6:05pm <br /> Approval of minutes: <br /> Brad Pittsley motioned to accept minutes from 8/15/19 as amended.Tom Fudala seconded. All in favor, <br /> motion passed. <br /> Status of Final Plan: <br /> -No implementation began other than the limited shellfish propagation and WWTP preliminary design. <br /> -JBCC shared facility proposal/report by Wright-Pierce. Selectmen voted to submit Town Meeting article <br /> for$250,000 towards study. <br /> -Water District Commission voted 2-1 against becoming a Water&Sewer District. <br /> -Mashpee Clean Waters Committee-Citizens Committee with a Facebook page will be holding an online <br /> conversation on 9/24. <br /> GHD WWTP Preliminary Design Project: <br /> -Work begun 1/2/19. Property surveys and topography completed. Preliminary layouts developed and <br /> public workshop held at July 18 meeting. Review of current draft of site plan. <br /> Glenn McCarthy and David Long from Mashpee Clean Waters Committee were present to hear <br /> Anastasia Rudenko and Lenna Quackenbush from GHD share the updated site plans.There were three <br /> updates: <br /> 1. Layout of the Site-Single entrance through the transfer station,with a Knox Box for 24 hour <br /> access. <br /> 2. Increased buffers-200 ft to the south and 200 ft from Ashers Path. <br /> MA DEP requires 25ft buffer for the sand beds, we are roughly 6X more. <br /> Tom Fudala mentioned that we added a 50 ft buffer along the transfer station to ensure the <br /> people to the north don't see the site. <br /> 3. Reduced Footprint- Got rid of the control building and incorporated it into the two remaining <br /> buildings.All equipment is inside buildings to control odor and odor is ducted into the ground. <br /> Working to control noise, but it is greatly mitigated by keeping everything in buildings. <br /> Brad Pittsley asked if the existing road would be adequate.Tom Fudala answered yes, they just need to <br /> work on the template with the Fire Department to make sure the Tower Trucks can get through. <br />
The URL can be used to link to this page
Your browser does not support the video tag.