Laserfiche WebLink
Schedule <br /> • Sewer Commission reviews GHD design drawings and provides <br /> comments to GHD — October 2019 <br /> • Review package submitted to VE team— November 15, 2019 <br /> • Basis of Design Memos <br /> • Drawings of Facility design <br /> • Engineers opinion of probable costs <br /> • VE review — November 2019 <br /> • GHD prepares VE Engineering Review Memo — December 2019 <br /> Mashpee Sewer Commission <br />