My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
11/18/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 9:40:09 AM
Creation date
11/21/2019 9:38:33 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
11/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*DRAFT SELECTMEN MINUTES 10-28-2019* 7 <br /> Board of Selectmen <br /> Minutes <br /> October 28, 2019 <br /> Presentation on Municipal Treatment Plant Technologies and Siting Considerations: GHD <br /> Engineering: (continued) <br /> Depending on flow, operation and typical maintenance, the life span of a treatment plant is 50 years. <br /> The Membrane Bioreactor(MBR) is a favorable option offering preliminary treatment; grit and <br /> screening, secondary/tertiary treatment, residuals management/solids handling and disinfection and <br /> flow metering. The MBR treatment process is capable of achieving TN 3 mg/L effluent without any <br /> additional downstream processes, and is capable of removing other contaminants. <br /> In considering Joint Base Cape Cod (JBCC) it was noted the leaching process to the canal is not a <br /> direct discharge to the canal. There is not an ocean outfall. In the oxidation process, JBCGpumps 12 <br /> miles toward the canal to sand beds, and there is a leaching process to the canal. With the <br /> regionalization of the 4 Upper Cape towns and possibly Barnstable the alternatives are large sand beds <br /> with various cost implementations and permitting requirements both on the federal and state levels <br /> with no guarantee that permitting would be obtained. <br /> When asked of the level of nitrates which ranges from 10 to 3 mg/L it was noted the Town of <br /> Falmouth is permitted for 3 mg/L total nitrogen and the Town of Chatham is similar. <br /> In terms of size the proposed Mashpee treatment plant; Site.4 would be constructed comparable to the <br /> Mashpee Commons wastewater treatment plant. To start staffing would most likely use one to two <br /> persons dependent upon the collection. Typically there is a lead operator and operations would <br /> encompass 3 persons and possibly two part-time persons. This could be a Town service or a <br /> contracted service. The Town of Chatham operates a contracted service. Currently four persons <br /> manage the collection system. <br /> Representatives from the Towns of Falmouth and Chatham are expected to give a presentation of the <br /> operation of their systems to include staffing levels. The Town of Falmouth system is run by the <br /> Town of Falmouth. <br /> Discussion followed regarding noise levels. New technology tends to reduce noise and odor from the <br /> site. At Mashpee Commons,the noise level is quiet. Additional funding could be expended to <br /> mitigate noise if it is so required. <br /> The Executive Summary of the GHD Report contains information regarding operations and <br /> maintenance. <br /> When asked if costs would be less expensive to have a regional plan as a centralized plan, it was noted <br /> that Mashpee has a decentralized system comprised of private facilities that service different clusters <br /> in Town. There is a need to treat other areas in Mashpee that do not have wastewater treatment, and as <br /> the other facilities age, they would need to be improved upon or incorporated into a larger system. <br /> This is a question to ask of the community. Do you compromise to take advantage of what you have <br /> to try to 'incorporate into the next step? .Or, do you develop one large facility at a large cost with <br /> collection systems and maintenance. There is no real serious look at developing one facility for the <br /> Cape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.