Laserfiche WebLink
Process of Site Evaluations <br /> • Review with Town possible sites for consideration (iterative process) <br /> • Establish general criteria with Town <br /> • (only publicly owned, public and private, etc.) <br /> • Identify potential sites <br /> • Evaluate sites for usage (treatment, recharge, both) <br /> • Mashpee had benefit of having USGS provide groundwater modeling from <br /> several sites as part of the initial screening <br /> • Review site criteria <br /> • Ownership, size, availability of land, existing use, soils, access, abutting land <br /> use, ACECs, critical habitats, wetlands, Zone Ils, watershed, historic district <br /> and potential aesthetic impacts (noise, visual, etc.). <br /> • Rank sites based on general criteria <br /> • Review with Town 1 discussion at public presentation <br /> • Identify any potential new site and review relative to scenarios <br />