Laserfiche WebLink
Building 1: Two stories, four shops each level, 4,960 sf each level, <br /> atrium stair, full balcony <br /> Building 2: Similar floor plan on one story, no atrium in center, second <br /> egress doors on back; access from parking lot. <br /> Three levels for total of approx. 15,000sf <br /> Tom F. questions where is 20ft. setback access from street for village <br /> look and sidewalk access. Also, CC Commission review needed. <br /> Modify circular driveway. Reviewed design several times with Greg <br /> Taylor. No retaining wall shown. Need to see road plan in relation to <br /> Rte 130 during construction to address run off. <br /> Glen H. states reviews needed for food service, 35 gal. per seat per <br /> restaurant. <br /> Sheldon H. states residential/mercantile use has different <br /> requirements than office/retail. Without knowing use, he cannot give <br /> answers. There is a 35f min. for fire truck; otherwise Rte 130 will have <br /> to be closed down during a fire. No-loading zone designation highly <br /> recommended. <br /> Dumpster on concrete slab needed; 9 1/2 X 20 parking space <br /> required; handicap space needs to be close to entrance and wide <br /> enough for a wheel chair. Parking area needs good lighting. <br /> Check Title V - Prior approval was for 9,000sf. This plan appears to <br /> be adding another 500 gal. per day with 15,000sf. Engineer will follow <br /> this up. <br /> To Do: File with CCCommission; clarify useage; clean site plan to <br /> Tom Fudala. <br /> Discussion <br /> Regulations for Erosion and Sedimentation Control: Tom F. <br /> suggested filing a proposed General Town By-Law so that we do not <br /> have to worry about grandfathering. <br /> The current DCPC proposal if approved would put a moratorium on <br /> everything for 45 days, including closings, occupancy permits, etc. <br />