My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/27/1999 SEWER COMMISSION Minutes
>
7/27/1999 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 2:09:58 PM
Creation date
12/9/2019 2:09:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/27/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASUPEE SEWER COMMISSION <br /> JUY 279 1999 <br /> TOWN HALL <br /> resent: John Cahalae, Worn Fuala,Dan Ayer <br /> Meeting convened at 6: 2 pm. <br /> REVEEW OF DRAFT CONTRACT WITH ST A NS AND WHELER <br /> Tom modified the Stearns and W.eler version of the contract, incorporating Dais s comments as <br /> Well as some other additions. <br /> e did not complete the modification of the scope of work. <br /> e changed assignment to "proi9ct"; owner to "Commission" . <br /> .1.4 Basic Services: <br /> .1.2 Torn changed it because i is already stated 1n the scope. <br /> 1.2. Included only errors. <br /> i <br /> He added the year 2000 warranty, although the project may not start until after that. <br /> .1 is a new section to ensure we the staff'which was proposed to work on the project actually <br /> mill.be. SR-B lists the personnel. <br /> 3.3 Warranty and Year 200 compliance. <br /> Time and Performance: <br /> John is concerned the Commission wont be able to meet the time. <br /> Tom said the SRF will hold up when we start but we will not hold them up from the schedule <br /> from the notice to proceed. <br /> Project Cost Control: regulatory requirements are Stearns and Wheler responsibility. Dan said it <br /> should be specific for the SR" loan because you are.granted the funds based on the project <br /> meeting certain requirements. <br /> ight of Review: Commission has the right to hire someone to review S&W's work. <br /> Vnbound file copy of report: so the town can make extra copies. <br /> Sub consultants: Mashpee has to.ap rove them and S&W has to provide of list of who the sub <br /> consultants are. <br /> x <br /> Pan said they must indicate if and the dollar value of their piece of the contract. <br /> 1 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.