My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/2/1999 SEWER COMMISSION Minutes
>
8/2/1999 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 2:10:24 PM
Creation date
12/9/2019 2:10:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/02/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5$ <br /> �w <br /> 1IS111 SEWED COMMISSION <br /> MONDAY,AUGUST 2, 1999 <br /> TOWN HALL <br /> Present: Dennis l alzarini, Torn Pudala, John Cahalane <br /> Meetinu convened at 7:05 p.m. <br /> IREVtEW OF ABAFT CONTRACT BETWEEN SEWER COMMISSION AND STEARNS <br /> AND WHELER <br /> SCODP Of Services: <br /> Stearns and Wheler's draft removed some items which were 1n the RFP, Torn put most of them <br /> . k in. Items 1n bold are those added back in. <br /> C. new' items, added by S&W. Tom thought Eric (Assistant Town Planner) and fate would work <br /> Ott the language but this was done by S&W. Tom amended it a little, included parcel based GIS <br /> because that was not mentioned. - <br /> Next paragraph: Toni moved it to phase 11(bottom of page . Ike also added seasonality and <br /> oipcupancy rates. <br /> Storm water loads: based on tpgraphie and best possible G1S data. <br /> Page : changed Owner to Commission <br /> Says S&W will prepare addendum- Toni added only if Commission requires it. <br /> Phase : SW left out a portion pf the RFP, Toni made the correction. <br /> Page 8, first line: RFP said each su waters ed, S&W said 10. Toni is not sure why. He has no <br /> problem with 1 . John thinks the CMAST contract probably says 1 . <br /> PP said 2 or 3 alternative scenarios, S&W says up to 3. Toni is not completely comfortable <br /> with that, he is afraid they will only do one. He will change it back.to 2 or 3. <br /> Page 9, Schedule: Tom has no prpblem with it, he will run it by Brian Howes to see if it 1s <br /> aeptale. <br /> WaqVoit Bay: Toni added language that we're open to considering Valiela' work. <br /> J hn gsked if there is a time franle for how long Dr. Howes' study is valid? What if we fall <br /> hired` <br /> Tom said only if there is some radical change to the Bay wich might effect the model, otherwise <br /> it is not time sensitive because he will produce a number-the amount of nitrogen the Bay could <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.