Laserfiche WebLink
e <br /> sntee under B. <br /> Page : Torn removed the section re: October 1999 town meeting education. <br /> Page I ; Tom wants this to be more particular and will add back in" as-detailed in scope and as <br /> generally represented' <br /> Stearns and Wheler did not submit a new table for tads, As and Bs. Torn will find out if the <br /> previous version is acceptable to then. <br /> They did not submit SR-B which is a list of personnel. <br /> They did not submit SR-C which is a list of S&W's su consultants. <br /> CONTRACT WITH DR. BRIAR HOWES <br /> His total contract now equals $67,89 7 not$6 1,000 because, at a meeting in Lakeville 'th DEP5 <br /> everyone realized he did not have enough model runs in the contract. There is not funding for <br /> a ditional model runs in the SR' loan. Brian proposed language that says if we don't need <br /> therm, we won't pay for them. <br /> Torn said the contract can be wriften to give the town-the ability for more model runs and use the <br /> funds�appropriated at town meeting or have two separate contract, one for the additional model <br /> ems. <br /> Torn will refer to Brian's existing agreement with the town when preparing that contract. <br /> Jahn asked if the amount of the extra costs associated with the SRF loan has been determined? <br /> Torn said it has not yet. The town received an SRC loan for the landfill and he will see what had <br /> to be done for that. <br /> The meeting adjourned at 8:28 p.m. <br /> Minutes submitted by Arden R. adrin <br />