Laserfiche WebLink
>r M <br /> etiog. <br /> Doug thinks ownership should be a non-issue. <br /> John asked if now is the time to approach 2 or 3 developers to start a district` <br /> Tom said the best time to approach town meeting is when the Stearns and Whel r plan is done <br /> but Mashpee Commons is ready now. <br /> There was discussion about cost savings to combing plants; a 50, 00-1 million gallon plant is <br /> the best range. Plants built too big with smaller amounts of flow have the most problems. <br /> Windchime has to build a plant at the 66 'Wit. <br /> 'tom said the biggest issue is the time and cost of the permitting process to do a combined <br /> p <br /> a .tditc . <br /> Doug suggested getting-Brian Dudley--DEP to.the table to outline the steps. <br /> Flow methodology: Doug suggested sending a combined letter to the CCC. <br /> Duncan told MC that actual flow is logical but-not.i ..their best interest. <br /> Doug said they will do the analysis of act als vs. a tuals and bring it back to the Sewer <br /> Commission. <br /> Buff re-iterated that they want to solve these problems and then work together with the Sewer <br /> Commission. They hope for the Commission support in going for their final EIR. <br /> Everyone agreed to have a second meeting with Mashpee Commons before a subsequent <br /> meeting with other developers. <br /> The members viewed a video on vacuum sever system. <br /> AirVac- is a collection system, not treatment. It brings wastewater to treatment. <br /> Tom does n t know of any installed in MA. <br /> Members will ask Steams and Whel r if they are familiar with this system. <br /> Meeting adjued at 9:25 p.m. <br /> Minutes submitted by Arden R. Cadrin <br /> i <br />