Article <br /> (Current Article on the 'Warrant) <br /> To see if the Town will vote to appropriate or transfer from available funds $1,640,000 to the Sewer. <br /> Commission Collection System Design Account, to complete the design of the first phase of the sewer <br /> collection system to be connected to the municipal wastewater,treatment plant to be located adjacent to <br /> the Town's solid waste transfer station, or take any other,action relating thereto. <br /> Submitted by the Sewer Commi-ssion <br /> Explanation: This article would provide funding far complete design of phase 1 of the sewer collection system <br /> to be connected to the wastewater treatment plant adjacent to the Town's solid waste transfer station. Work <br /> on collection system design would begin in late summer 2019 and be completed in December 2020, with <br /> construction anticipated in 2021 through 2023, pending funding and permitting for said construction. This <br /> project is one of the initial steps in implementing the Town's Watershed Nitrogen Management Plan/CWMP. <br /> Article <br /> (Current Article on the warrant) <br /> To see if the Town will vote to appropriate or transfer from available funds $840,000 to the Sewer <br /> Commission Wastewater Treatment Plant Design Account,to complete the design of Phase 1 of the municipal <br /> wastewater treatment plant to be located adjacent to the Town's solid waste transfer station, or,take any <br /> other action relating thereto. <br /> Submitted by the-Sewer Commission <br /> Explanation: This article would provide funding to complete final design of phase 1 of the wastewater <br /> treatment plant to be located adjacent to the Town's solid waste transfer station. Work o.n preliminary <br /> designs for the plant is currently under way; expected to be completed by the end of 2019, using nitrogen <br /> mitigation funds held by the Cape Cod Commission as the result of conditions imposed on a*number of <br /> Development of Regional Impact projects. This proposed funding would allow continuation of design work, <br /> to full design of Phase 1, upon completion of the preliminary design. This project is one of the initial steps in <br /> implementing the Town's Watershed Nitrogen Management Plan/CWMP. <br /> Article <br /> (Proposed article to replace the two articles from the Sewer Commission-above) <br /> SPECIAL PURPOSE STABILIZATION FUND FOR WASTEWATER INFRASTRUCTURE AND INVESTMENT <br /> (written by Town Counsel) 2/3 vote required <br /> To see if the Town will vote pursuant to Chapter 40, Section 5B of the General Laws to create a special <br /> purpose Wastewater Infrastructure and Investment Stabilization Tund, created for the purpose of funding <br /> the planning, design, permitting, construction and implementation of wastewater collection, treatment and <br /> disposal initiatives in the Town of Mashpee, including all expenses incidental and related thereto, with said <br /> funds to.be expended,'upon appropriation, by the Board of Selectmen; and further to raise and/or transfer <br /> from available funds-and appropriate the sum of$2,480,000 to be deposited into said Stabilization Fund, or <br /> take a-ny other action.relating thereto. <br /> Submitted by the Board of Selectmen <br /> Explanation: XXXXXxX <br />