Laserfiche WebLink
own :of 1 S ee <br /> 16 G JA tTi <br /> Ia7as1zJ5.ee,Wassachiis&ts 0?6 9 <br /> Mashpee Conservation Commission Minutes <br /> Thursday, November 14, 2019 <br /> Mashpee Town Hall <br /> 16 Great Neck Road North <br /> Waquoit Meeting Room <br /> Present: Thomas O'Neil, Charles Dalton, Chad Smith, Dale McKay <br /> Commissioner Vice Chairman Chad Smith called the meeting to order: 6:00 p.m. <br /> No Public Comment <br /> PRE/POST-HEARING AGENDA: <br /> Pre/Post Roll Call Vote: Agent requested a roll call vote for items not submitted to Town Clerk on time. <br /> Motion: Mr. McKay moved to approve the roll call vote, Mr. Dalton seconded. <br /> Vote: 4-0 unanimous <br /> Minutes: October 10, 2019 Motion: Mr. McKay moved to approve the 10/10/19 minutes, Mr. <br /> Dalton seconded. <br /> Vote: 5-0 unanimous <br /> October 24, 2019 Minutes (Tabled until December meeting) <br /> • Update: Enforcement Order 110 Popponesset Island Road <br /> We did hear from the homeowner after some sort of mix up with receiving the certified mailing of the <br /> enforcement order. They did acknowledge receipt, but it was received past the stated deadline of <br /> November 11th for submittal of a formal restoration/mitigation plan. <br /> Reminder: Upper Quashnet River Restoration kick-off meeting date poll (Horsley Witten Group) <br /> Agent asked if everyone received and responded to the email regarding availability. He will resend <br /> the email for everyone to respond to. <br /> • ADDITIONAL TOPICS: <br /> (This space is reserved for topics that the Chairman did not reasonably anticipate would be <br /> discussed). <br /> HEARINGS: <br /> 6:00 Raymond L. & Christine P. Tetrault, 41 Buccaneer Way. Proposed installation of driveway RDA <br /> and drywells. <br /> Raul Lizardi from Cape & Islands Engineering represented the applicant. He reviewed plans <br /> that involve additions to the existing house, detached garage and new driveways outside of <br /> 100ft jurisdiction of coastal bank. A portion of the proposed driveway lies within 100ft. The <br /> proposed work is happening without actually affecting the coastal bank. Runoff will be <br /> collected in two drywells. Agent asked about the space around the driveway/drywells. Mr. <br /> Lizardi said it's cleared for construction, no proposed structures or patios. There will be <br /> landscaping in some form. Agent asked if driveway within 100ft, is it to be pervious? Mr. <br /> Lizardi answered impervious. Agent asked if there will be any capture of runoff, Mr. Lizardi <br /> said there's no proposed drainage collection. Agent said he would like to see details on the <br /> blank space, if earthen berm, how is it stabilized? Curious why so much separation? Is that <br /> what's needed for construction overreach? Mr. Lizardi said elevation 28 occurs 3ft from end of <br /> parking, from that point to coastal bank the grades slopes backward. 5ft graded for <br /> construction of driveway builds back 1ft of structure, not substantial but is disturbed for <br />