Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JULY 22,2020 <br /> Mr. Bonvie made a motion to issue a Special Permit for the cottage project with the <br /> following conditions; <br /> I. The Board has determined that the applicant meets all the conditions of a Special <br /> Permit under Mass General Law 40A Section 9. <br /> 2. Site Plan: 19 Pem Lane,Mashpee,MA. Prepared for Richard&Diane Cook,Date: <br /> April 29, 2020, Scale: 1"=20', Prepared by: Down Cape Engineering, Inc. Signed <br /> by: Dan O'Jala, P.E., P.L.S., Stamped: Dan O'Jala, No.: 40980, and 46502, <br /> Professional Land Surveyor, and Civil Engineer. Proposal: Replace existing 762 <br /> sq. ft. footprint cottage with new 747 sq. ft. footprint cottage further back from <br /> resource areas. Hardscape to be reduced over existing conditions. <br /> 3. F1oorTlan: 19 Pem Lane,Mashpee,MA.Cools Residence,Re-Built Guest Cottage, <br /> Prepared by: Cotuit Bay Design,LLC,A-1:First Floor Plan and Second Floor Plan, <br /> Scale: ''/a"= 1'-0",Date: 6/15/2020.A-2: Southwest Elevation, Southeast Elevation, <br /> Northeast Elevation, and Northwest Elevation. <br /> 4. Conditioned on all Town Department comments read into the record. Included but <br /> not limited to the Board of Health. The applicant must seek and obtain approval by <br /> the Board of Health included but not limited to a bedroom designation count etc. <br /> Sharon seconded, yes <br /> Mr. Bonvie,,;yes <br /> Mr. Goldstein, yes, <br /> Mr. Blaisdell, yes, <br /> Mr. Furbush,yes. <br /> All were in favor of the raze and replace of cottage. <br /> E <br /> 4 <br />