Laserfiche WebLink
'Town o- <br /> orfcs <br /> MashP nxynt o I-lubfiz <br /> ..�°III�III (�I� �V�wm <br /> ; iT IIII u w -p1 m nw, �m mmmmmm«rvm gym.. mmmmmmmmmmmmmmmmm�mmm� ��wwwwwwwww wwwuwwu:uw r iiii <br /> gym, <br /> p IIIIIII �I hll' k V w rrrr �, uvuvum w m w w mmmnir rr nmma ..w .� m rrrrrrrrrrrrrrrh <br /> �a I y f III uullpl III �� ._.__ „ten wwww ��w��WWWw� � aa��� <br /> It 4d ""P III II IIII �III,'� yVmmmmmm �G <br /> U I IIII� MeetirQrjhouse!ko,ad. <br /> II <br /> /✓ <br /> Yoh 'x <br /> u ✓1, <br /> " ' ashpee, Miusa-chuseus <br /> 02649 <br /> 17'e"lepholle - (5`08)-5-39-1420 <br /> Fa,T <br /> MEMORANDUM <br /> DUD <br /> August 26, 2020 <br /> TO: Board of Selectmen <br /> Rodney Collins, Town Manager <br /> FROM.- Catherine Laurent, Director ctk/ <br /> RE: Route 151 Corridor Improvement Project--Public Notice for Tree Removal <br /> Description <br /> The Route 151 Corridor Improvement Project is included on the Cape Cod Transportation Improvement <br /> Plan for FFY21/22/23. Construction will be funded through state and federal monies. The project <br /> includes extension of the multi-use path,construction of a sidewalk, reconfiguration of <br /> intersections/upgrade of traffic signals, improvement of drainage, and repaving of the road. <br /> The Town is required to file an Environmental Notification Form (ENF) with MEPA as the project met <br /> specific thresholds. <br /> • widening of an existing roadway by four or more feet for one-half or more miles. <br /> 0 Construction,widening or maintenance of a roadway or its right-of-way that will: <br /> a. alter the bank or terrain located ten more feet from the existing roadway for one-half or more <br /> miles, unless necessary to install a structure or equipment; <br /> b. cut five or more living public shade trees of 14 or more inches in diameter at breast height <br /> The removal of the shade trees requires a public meeting and approval by the Board of Selectmen. <br /> ck Irou nd <br /> Construction of the project necessitates the clearing of land and removal of trees,specifically for <br /> construction/extension of the multi-use path,construction of the sidewalk, installation of drainage <br /> improvements, and widening of the Route 151/old Barnstable Road intersection associated with the <br /> addition of dedicated left-turn lanes. The clearing/removal is necessary not only for the improvements <br /> themselves but also associated grading. <br /> For Phase 1,from Mashpee Rotary to approximately the old Barnstable Road intersection, will require <br /> 1.92 acres of clearing/grubbing and specifically removal of 47 shade trees. <br /> For Phase 2,from approximately the Cold Barnstable Road intersection to the Town line will require 2.64 <br /> acres of clearing/grubbing and specifically removal of 38 shade trees. <br />