My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/12/2020 ZONING BOARD OF APPEALS Minutes
>
8/12/2020 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 2:53:17 PM
Creation date
9/11/2020 2:53:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 12,2020 <br /> Jonathan read an email sent by Charlie to Tom Bunker dated June 9,2020 into the record. <br /> Charlie read the description of a Written Finding. Jonathan suggested that the Board <br /> discuss the specifics of the bylaws at a later date. <br /> Jonathan read an email from the Conservation Agent dated July 29, 2020 into the record. <br /> There were no comments from the Board of Health. There were no more comments from <br /> the Board, and no comments from abutters. <br /> Ron made a motion to issue a Written Finding to Nancy J. Cleary of 4 Wheelhouse Lane, <br /> under §174-17 (a pre-existing, non-conforming structure) of the Zoning Bylaws to allow <br /> for construction of a stairway on property located in an R-3 Zoning District, (Little Neck <br /> Bay),Map 120 Parcel 155,Mashpee,MA with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written <br /> Finding under Mass General Law 40A Section 6. <br /> 2. Plot Plan: Proposed Porch and Stairs at 4 Wheelhouse Lane, Mashpee, MA, <br /> Prepared for Jack & Nancy Cleary, Prepared by: BSS Design Engineering & <br /> Surveying, Scale: 1"=20',Date: June 29,2020,Drawn by:EJP,TJB, Checked by: <br /> TB,Job Number:20003,Drawing Number:P-28-22,Stamped by:Thomas Jackson <br /> Bunker,No. 32653 Registered Land Surveyor. <br /> 3. Conditioned on all Town Department comments read into the record. Including but <br /> not limited to the Conservation Commission statement that the applicant needs to <br /> seek and obtain their approval. <br /> Norman J. Gould, seconded, yes <br /> Scott Goldstein,yes, <br /> Bill Blaisdell, yes, <br /> Ron Bonvie, yes, <br /> Jonathan Furbush, yes. <br /> All approved the Written Finding for the stairway. <br /> Ron made a motion to issue a Variance to Nancy J. Cleary for 4 Wheelhouse Lane under <br /> §174-33 (setback from wetlands) of the Zoning Bylaws to allow for construction of a <br /> stairway on property located in an R-3 Zoning District, (Little Neck Bay),Map 120 Parcel <br /> 155,Mashpee,MA,with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Variance <br /> under Mass General Law 40A Section 10. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.