Laserfiche WebLink
Joe Lyons moved that GHD gives an estimate on the cost to do collection in the Santuit <br /> area in connection with the transfer station, and do it during the time of Phase 1, design it, <br /> but not to be installed during Phase 1. No second. Motion failed. <br /> Joe Lyons said we should ask GHD to give a full size print that shows the proposed collection <br /> area for Phase 1. Anastasia Rudenko said it's currently being worked on per request from the <br /> Selectmen. <br /> Mike Rapacz explained to the group his concerns about Mashpee Wakeby Pond's phosphorous <br /> problem. He said 25+years ago the when the MA Estuaries Project was done, the freshwater <br /> bodies were ignored. He said Mashpee Wakeby was recently found to be severely phosphorous <br /> impaired. He would like to include the western side of Mashpee Wakeby in the sewering plans. <br /> If Sandwich does what they say they're going to do in their Phase 1, it covers the northern side. <br /> He referenced the Red Field Ratio, an APCC study on all ponds, and results from chemical <br /> testing from Chatham Lab. Joe Lyons said if documented properly and made public,this will <br /> help move forward with the plan. Anne Malone said his point is accurate, but we're just barely <br /> getting started. The group thanked Mike Rapacz for coming and asked that he email them his <br /> data. <br /> Adjournment <br /> Motion: Mr. Dunn moved to adjourn,Mr. Pittsley seconded. <br /> Vote: 5-0 Unanimous <br /> Meeting Adjourned 10:05pm <br /> Respectfully submitted, <br /> Katrina Ewing <br /> Board Secretary <br />