My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/9/2020 ZONING BOARD OF APPEALS Minutes
>
9/9/2020 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 9:37:09 AM
Creation date
9/28/2020 9:37:00 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
09/09/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> SEPTEMBER 9,2020 <br /> Attorney, Christopher Kirrane represented the applicant. Also present was Raul Rivera, <br /> with Cape&Islands Engineering.Mr.Kirrane provided his written remarks explaining the <br /> details of the project. There are two non-conforming aspects on the property. One of the <br /> setbacks is 10.8 ft. and the required setback is 15 ft.There's also a non-conforming setback <br /> to the wetlands, and that setback will increase 3 ft. because of the second floor overhang. <br /> The first floor will decrease the non-conformity to 46 ft. The shed will be eliminated. The <br /> project is a substantial improvement than what currently exists. The Conservation <br /> Commission has approved the project, and there will be a new Title 5 Septic System. <br /> The Variance request under Section 174-33 is for the pool because that is not part of the <br /> existing structure. Mr. Kirrane believes that this Variance can be granted due to the shape <br /> of the lot, and is considered a hardship. <br /> The site plan depicts the northeast side setback will be improving from 10 ft.to 15 ft. Raul <br /> said that the overhang is allowed in zoning, and this particular overhang is included in his <br /> lot coverage calculation. The Board confirmed that the percent lot coverage is 19.5%. <br /> Scott wanted to know if the second story cantilevered deck, and the first floor deck were <br /> included in the lot coverage. Raul said yes, both are included in the lot coverage. The <br /> cantilevered deck overlaps the first floor deck. <br /> Chairman Furbush wanted to know if the pool was included in the lot coverage. Raul said <br /> yes. <br /> Mr.Bonvie asked how close the closest structure was to the wetlands.Mr.Kirrane said that <br /> the existing shed is closest the wetlands, but that is being eliminated. He said that the <br /> distance is approximately 41 ft. to the wetlands which is the second story overhang. The <br /> closest is 46 ft. on the first floor. The distance request is 3 ft. <br /> Charlie said that he doesn't believe that this project requires Section 174-33 because it's <br /> less non-conforming. Attorney Kirrane thought that the patio was included and would <br /> require the Variance. The Variance was initially for the pool. <br /> Sharon read the Board of Health comments dated September 9, 2020 into the record, and <br /> the Conservation comments into the record. <br /> There were no more comments from the Board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.