Laserfiche WebLink
-------------- <br /> Environmental Engineers/Consultants <br /> UMMEMMUMMMMEMMEM <br /> 49 1_`d1e Bill ill Road <br /> -------------------------------------------...........--------------------------------------------- <br /> Newton, Massachtiscus 02467 <br /> (617) 964-2924 <br /> -- __ - __ __--------------------- --------------------------..- <br /> Portable: (617) 529-4191 <br /> ----------- <br /> Fax: (617) 332-5477 <br /> E-mail: 1)io(q)]-,oiiib,,irdoAssociates.coxii <br /> July 19, 2010 <br /> Mashpee Sewer Commission <br /> Town of Mashpee <br /> 16 Great Neck Road North <br /> Mashpee, MA 02469 <br /> F. Thomas Fudala, Chairman Oskar Klenert <br /> Button Kaplan, Vice Chairman Joseph N. Lyons <br /> Ralph Marcelli, Clerk Thomas O'Hara <br /> Jack Malarkey <br /> Dear Commissioners: Re: Innovative Decentralized Wastewater <br /> Nitrogen Removal Demonstration Projects <br /> Grant Application Proposal <br /> To enable the Town of Mashpee to integrate the lowest nitrogen removal options as a component of <br /> the comprehensive wastewater management plan and to reduce costs and speed time to water quality <br /> restoration, Lombardo Associates, Inc. (LAI) recommends the pursuit of grant funding for the following <br /> Innovative Decentralized Wastewater Nitrogen Removal Demonstration Projects. <br /> 1. Pirate's Cove groundwater treatment <br /> 2. Mashpee River— River Road area groundwater treatment <br /> 3. Treatment Plant Upgrade— High School and/or a WWTP <br /> 4. On-Site Systems Upgrade <br /> Presented below are preliminary placeholder budget recommendations and planning level overviews <br /> of the proposed demonstration projects. <br /> Sizing/ Budget Allowance <br /> Study Performance <br /> Comments Design/Build Monitoring Total <br /> I Pirate's Cove Groundwater Treatment <6,000 ft. $ 2,000,000 $ 200,000 $ 2,200,000 <br /> 2 Mashpee River- Groundwater Treatment <4,000 ft. $ 1,760,000 $ 200,000 $ 1,950,000 <br /> River Road Area I 1 1 <br /> 3 Treatment Plant Treatment Plant Upgrade— TBD <br /> Nitrogen Removal <br /> 4Fon-Site Systems On-Site Systems Upgrade— —30 systems $ 360,000 $ 100,000 $ 460,000 <br /> I Nitrogen Removal I I I I <br /> X\Projects-Open\6235 Town of Mashpee\02. Business\Proposal\l 00719 Mashpee Demonstration Projects Proposal.doc <br />