My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/2010 SEWER COMMISSION Minutes
>
8/5/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:05:46 PM
Creation date
10/2/2020 2:01:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/05/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Innovative Decentralized Wastewater <br /> Nitrogen Removal Demonstration Projects <br /> Grant Application Proposal <br /> July 16, 2010 <br /> Page 5 <br /> On-Site Sytems Upgrade <br /> LAI proposes on-site sytems upgrades for additional nitrogen removal for a representative sample (say <br /> 30) of the existing individual VA septic systems to achieve effluent TN of< 5 mg/l. <br /> Grant Application <br /> Lombardo Associates, Inc. (LAI) submits this proposal to the Mashpee Sewer Commission <br /> (Commission) for services related to completion of a Clean Water State Revolving Fund (SRF) 2011 <br /> project funding application for the Commission selected demonstration project(s). It is noted that the <br /> grant application could be used for potential congressional funding applications. <br /> LAI's services will consist of preparation of the necessary reports and application for SRF grant <br /> funding under the Green Reserve program, including the following tasks: <br /> 1. Project Evaluation Report <br /> 2. SRF Project Evaluation Form (PEF) &Application <br /> SCOPE OF SERVICES <br /> Task 1: Project Evaluation Report(PER) <br /> Lombardo Associates, Inca (LAI) will prepare a Project Evaluation Report (PER) for the SRF <br /> application. <br /> Task 2: Project Evaluation Form (PEF) &Application <br /> LAI will prepare the Project Evaluation Form (PEF) and additional required application documents for <br /> submission to the Massachusetts Department of Environmental Protection (MassDEP). The PEF will <br /> include: <br /> • Part I Proponent and Project Identification and Certification <br /> • Part II Project Schedule and Cost Estimation <br /> Part III Project Narrative Checklist <br /> • Appendix A Project Site Map <br /> • Appendix B Planning Report(s) used as project basis <br /> Appendix C Laboratory analysis and other documentation <br /> SRF Application is required to be submitted by August 16, 2010. <br /> SCHEDULE <br /> Lombardo Associates, Inc. proposes to perform the Scope of Services described above in accordance <br /> with the following schedule. <br /> Environmental Engineers/Consultants <br /> 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.