My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/2010 SEWER COMMISSION Minutes
>
8/5/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:05:46 PM
Creation date
10/2/2020 2:01:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/05/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum#1 <br /> The Agreement dated 19th June 2007 Between the Town of Mashpee by its Sewer Commission <br /> (COMMISSION) and Lombardo Associates, Inc. (ENGINEER) for Study and Report <br /> Professional Services, is hereby amended as of , 2010 by the following <br /> additions to Exhibit A: Scope of Services,Method of Payment and Related Matters: <br /> SCOPE OF SERVICES <br /> Insert at the end of Section: <br /> "ENGINEER will provide services related to completion of a Clean Water State <br /> Revolving Fund (SRF) 2011 project funding application for the Commission selected <br /> demonstration project(s). ENGINEER's services will consist of preparation of the <br /> necessary reports and application for SRF grant funding under the Green Reserve <br /> program, including the following tasks: <br /> Task 1: Project Evaluation Report(PER) <br /> ENGINEER will prepare a Project Evaluation Report(PER) for the SRF application. <br /> Task 2: Project Evaluation Form (PEF) & Application <br /> ENGINEER will prepare the Project Evaluation Form (PEF) and additional required <br /> application documents for submission to the Massachusetts Department of Environmental <br /> Protection(MassDEP). The PEF will include: <br /> • Part I Proponent and Project Identification and Certification <br /> • Part II Project Schedule and Cost Estimation <br /> • Part III Project Narrative Checklist <br /> • Appendix A Project Site Map <br /> • Appendix B Planning Report(s)used as project basis <br /> • Appendix C Laboratory analysis and other documentation <br /> SRF Application is required to be submitted by August 16, 2010. <br /> DELIVERABLES <br /> Insert at the end of Section: <br /> "ENGINEER will prepare a Project Evaluation Report (PER) for the SRF application. <br /> ENGINEER will prepare the Project Evaluation Form (PEF) and additional required <br /> application documents for submission to the Massachusetts Department of Environmental <br /> Protection(MassDEP). <br />
The URL can be used to link to this page
Your browser does not support the video tag.