Laserfiche WebLink
Mashpee Sewer Commission &Town Manager <br /> August 5, 2010 <br /> Page 4 <br /> option. Additionally LAI will hold three (3) design charette meetings with the Commission and <br /> community to facilitate the definition of the Preferred Option. <br /> Task 6. Final Report <br /> LAI will prepare a Final Report that integrates the project activities. The Report will be in a format <br /> that can be used for pursuit of State Revolving Fund (SRF) Program Green Reserve grant and/or <br /> loans for the decentralized groundwater treatment project. <br /> SCHEDULE <br /> Lombardo Associates, Inc. proposes to perform the Scope of Services described above on a best <br /> efforts basis with the actual completion being contingent upon the timeliness of LAI receipt of <br /> required information. It is proposed that the Scope of Services would be performed as follows: <br /> Task Completed Months After <br /> Authorization to Proceed <br /> 1. Baseline Conditions <br /> 2. Pirates Cove Groundwater Quality and Flow Characterization 4 <br /> 3. Pirates Cove Analytical Groundwater Model 4 <br /> 4. Identification and Evaluation of Alternative Groundwater <br /> Treatment Options and Selection of a Preferred Option 6 <br /> 5. Meetings w/ Sewer Commission & Pirate's Cove Community Throughout Project <br /> 6. Final Report 6 <br /> 1?nvironmcntal Engineers/consultants <br />