My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/17/2010 SEWER COMMISSION Minutes
>
8/17/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:01:15 PM
Creation date
10/2/2020 2:02:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r • <br /> ai�PS� <br /> i <br /> � o ' <br /> 8 <br /> 4 i�4a <br /> l �Y <br /> When 10 gallons of wastewater Wastewater travels at 15 to 18 fps <br /> Wit { A traditional gravity in the vacuum main,which is <br /> { line carries wastewater collects in the sump,the laid in a sawtoath fashion to <br /> Works: 4 from the customer AIRVAC valve opens and <br /> differential pressure propels the insure adequate vacuum levels <br /> j to an AIRVAC at the end of each line. <br /> valve pit package. contents into the vacuum main. <br /> a <br /> 1 2 3 <br /> P . H <br /> 4"Air Intake AIRVAC Valve <br /> 'I with Stainless Pit Package i`f <br /> ,- - � Steel Screen H2O Rated „r. <br /> a <br /> i <br /> or Profile <br /> vacuum Ufrom customer SensorPip7w Main <br /> ', <br /> rav Vacuum <br /> Service Line Sump Sewer <br /> 's <br />
The URL can be used to link to this page
Your browser does not support the video tag.