My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/2010 SEWER COMMISSION Minutes
>
11/16/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:13:02 PM
Creation date
10/2/2020 2:04:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town ofMashpce <br /> Capital Improvement Program n, '2011 Project Request Form <br /> (Please pipe All Responses) <br /> Date 11-25-09 <br /> Project No. I <br /> 1. Project or Equipment(Short Title) Effluent Relocation Pipeline and Discharge Area <br /> 2. Description and Purpose of'Project or Equipment: <br /> Pipeline and associated pumping facilities to move treated wastewater from existing wastewater <br /> treatment facilities(Mashpiee Commons,Windchime Point,SouthCape Village etc,)to new <br /> subsurface discharge area at New Scabury Golf Course or alternate location outside Popponesset <br /> watershed. Purpose is to remove nitrogen from Mashpee River and Popponesset Bay watershed in <br /> order to begin achieving nitrogen reduction targets set for Popponesset Bay by DEP and EPA. <br /> Initial year funds for detailed discharge site evaluations and engineering design. <br /> Estimate Life of Project or Equipment 50+ Years <br /> 4. Status of Project or Equipment <br /> Site Secured x Not Secured Not Required <br /> Survey of Need Under Study x Completed Not Required <br /> Preliminary Plans/Specs x Under Study _ Completed Not Required <br /> Final Plans or Specs Under Study _ Completed Not Required <br /> 5. Priority 6, Cost Estimates <br /> Urgent x Preliminary Final <br /> Necessary x <br /> Desirable Land Costs unknown <br /> Construction Cost $9,000,000 <br /> Other Cost $900,000 <br /> 'total Cost $9,900,000+land <br /> 7. Effect on Actual Operating Budget 8. Source of Farads <br /> Operational(+) $unknown Current Revenue $ <br /> Maintenance(+) $unknown Bond Issue $9,900,000+ Years <br /> Total(+)(-) $unknown Short Term Note $ Years <br /> Revenue from Project $unknown /yr Other(describe) DRJ mitigation fees,system <br /> Now Personnel Required $unknown development charges,SRF loan <br /> 9, Year Proposed for Construction or Acquisition FY 2012-2013 <br /> 10. Comments and Justification(Please attach a sheet describing need in detail include the cost of not <br /> completing this project) <br /> 11. Signature itle Chairman,Sewer Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.