My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/2010 SEWER COMMISSION Minutes
>
11/16/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:13:02 PM
Creation date
10/2/2020 2:04:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee <br /> Capital Improvement Program FY 2011 Project Request Form <br /> Department Sewer Commission <br /> Project No. 3 <br /> Date 11-25-09 <br /> 1. Project or Equipment(Short Title) Decentralized Wastewater Facilities <br /> 2. Description and Purpose of Project or Equipment: <br /> Development of neighborhood cluster,on-site and other wastewater treatment and disposal <br /> facilities in areas not suitable/cost effective for large-scale municipal sewer facilities. <br /> 3. Estimate Life of Project or Equipment 25+ Years <br /> 4. Status of Project or Equipment <br /> Site Secured x Not Secured Not Required <br /> Survey of'Need Under Study x Completed Not Required <br /> Preliminary Plans/Specs x Under Study Completed Not Required <br /> Final Plans or Specs Under Study Completed Not Required <br /> 5. Priority 6. Cost Estimates <br /> Urgent x Preliminary Final <br /> Necessary x <br /> Desirable Land Costs unknown <br /> Construction Cost $49,050,000 <br /> Other Cost $5,450,000 <br /> Total Cost $54,500,000+land <br /> 7. Effect on Actual Operating Budget 8. Source of Funds <br /> Operational(+) $unknown Current Revenue $unknown <br /> Maintenance(+) $unknown Bond Issue $unknown Years <br /> Total(+)(-) $unknown Short Term Note $ Years <br /> Revenue from Project $unknown /yr Other(describe) Betterments,DRT mitigation fees, <br /> New Personnel Required $unknown_ System development charges,connection fees,SRF Loans <br /> 9. Year Proposed for Construction or Acquisition FY 2012+ <br /> 10, Comments and Justification(Please attach a sheet describing need in detail include the cost of not <br /> completing this project) <br /> 11. Signature <br /> Chairman,Sewer Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.