My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/01/2020 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2020-2029
>
2020
>
06/01/2020 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:58:04 PM
Creation date
10/29/2020 3:44:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
06/01/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.2 4 <br /> Town of l ashpee <br /> Bid opening Minutes <br /> Paving and Catch Basin Adjustment <br /> Wednesday, May 20, 2020 <br /> mm,, , �mmmmmmmmm � m <br /> l 1 <br /> ��/ <br /> / � <br /> F 12l FY22 FY21 FY22 F i 21 FY22 <br /> Bituminous Concrete, per tan $93r00 $96.00 $106.00 $106.00 $11.5.00 $117.00 <br /> ,..... <br /> Bituminous Corncrete,with tack, perton $96.50 $106.00 106.00 $118.00 $120.00 <br /> 6"Asphalt Curb, per foot $2.40 $2.50 $6.00 $6.00 $8.80 $9.25 <br /> Y <br /> Box Work, per torn $120.00 $123-50 $150.00 $150.00 $360.00 $380.00 <br /> Handwork,<30 tons, per ton $235.00 $242.00 $310.00 $310.00 $360.00 $380.00 <br /> Handwork,>30 tons, per tarn $175.00 $180.25 $310.00 $310.00 $21000. 230r00 <br /> i <br /> Catch Basin Adjustment $335.00 350r00 3! Or00 $350.00 $495.00$ $ $495.00 <br /> Cold Patch, Picked Up, per ton $120.00 $123.00 $200.00 $200.00 $500.00 $500.00 <br /> . ............ <br /> Hot I'►/Iix, Picked Up, per ton 75.00 $77.00 $106r00 $106.00 $80.00 $85-00 <br /> Grader(CAT 14 or equiv.)with Operator, <br /> per hour 213-00 $219.50 $225.00 $225-00 $800.00 $840.00 <br /> Vibratory Roller with Operator, per hour <br /> $177.00 $182.50 $175.00 $175.00 $800.00 $840.00 <br /> Skid Steer with Cold-Planing Attachment <br /> with Operator,, per hour $253.00 $260.50 $225.00 $225.00 $800.00 $840.00 <br /> Groundman with Equipment and <br /> r $127.00 $131.00 $125.00 $125.00 $150.00 $170000 <br /> vehicles, per hour <br /> mm mm m m <br /> O ra u n d m a n with Equipment, no vehicle, �/�}�/''�] �/'+�j <br /> $89.00 $91.50 $100-00 � $100-00 . �.sV.V� * 1.�v.aV <br /> per hour <br /> Ni;;11101011 <br /> 11 <br /> iY11;31V4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.