Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> November 18,2020 <br /> Attorney Kirrane submitted a revised floor plan to accommodate the Board of Health <br /> concerns that two doors needed to be removed in order to approve the new septic system, <br /> and were submitted prior to the meeting. <br /> Mr. Furbush had no concerns with the project and polled the Board members. Bill had no <br /> issues. Ron wanted to make sure the height of the new dwelling conformed to the bylaws, <br /> and will leave that for Charlie to review. Jim Gould had no comments. Jim Reiffarth had <br /> no comments, Sharon, no comments, and George, no comments. <br /> Sharon read the Board of Health comments dated November 17, 2020 into the record, and <br /> the Conservation comments into the record. <br /> There were no more comments from the Board, and no abutter phone calls. <br /> Mr. Bonvie made a motion to approve the Special Permit application for 16 Spoondrift <br /> Circle with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Special <br /> Permit under Mass General Law 40A Section 9. <br /> 2. Plot Plan: -Existing Conditions and Demolition Plan Prepared for Peter & Carolie <br /> Owens, 16 Spoondrift Cir, Mashpee, MA. Prepared by: BSS Design Engineering <br /> & Surveying, Scale: 1" = 20', Date: Aug. 17, 2020, Drawn: EJP, Job Number: <br /> 17126, Title: Existing&Demo 1 of 3, Drawing Number: P25-45. <br /> 3. Plot Plan: - Proposed House and Subsurface Sewage Disposal System Upgrade, <br /> Prepared for: Peter & Carolie Owens, 16 Spoondrift Cir, Mashpee, MA. Scale: 1" <br /> =20',Date: Aug. 17,2020,Drawn by:TJB,Checked by: JER,Job Number: 17126, <br /> Title: Site Plan 2 of 3,Drawing Number P25-45., Site Plan: SSDS 3 of 3, Drawing <br /> Number P25-45. <br /> 4. House Plans: Owens Residence, 16 Spoondrift Cir., Mashpee, MA, Prepared by: <br /> Archi-Tech Associates Inc., Job No.: 1919, Date: June 29, 2020, Scale: As Noted, <br /> Drawn by: JAL, ELC, A-2: First Floor Plan, A-3: Second Floor Plan, A-4: <br /> Front/Southeast Elevation, Right/Northeast Elevation, A-5: Rear/Northwest <br /> Elevation, Left/Southwest Elevation. Revised Plan dated November 12, 2020. <br /> 5. Conditioned on all Town Department comments read into the record. Including <br /> but not limited to the Board of Health comments dated November 17, 2020. <br /> Bill Blaisdell, seconded, yes, <br /> Sharon Sangeleer, yes, <br /> Jim Gould, yes, <br /> Ron Bonvie, yes, <br /> Jonathan Furbush, yes. <br /> All were in favor of the raze and replace project. <br /> 3 <br />