Laserfiche WebLink
21 <br /> Report of the Highway Surveyor <br /> To the Honorable Board of Selectmen <br /> and Citizens of the Town of Mashpee <br /> I herewith submit my annual report as Highway Surveyor <br /> for the year ending December 31, 1958. Chapter 90 construc- <br /> tion work on Cotuit Road consisted of 4,100 feet of new road, <br /> 21/z inches of asphalt was applied and seal coated. Work will <br /> continue next spring. Under Chapter 90 Maintenance 3,000 <br /> feet of Red Brook Road was seal coated. On Waquoit cut-off, <br /> Rte. 151 shoulder work and drainage and necessary work <br /> was done where needed. On Monomoscoy Road 5,000 feet were <br /> widened, straightened, hardened, and 2 inch mix in place <br /> added. A portion of the Highway General Appropriation was <br /> used to supplement Chapter 81. <br /> Chapter 81 700 feet 3 inches of mix in place on Quashnett <br /> Road and 700 feet 3 inches mix in place on New Town Road. <br /> 500 feet 3 inches mix in place on Church Road. Lake Avenue <br /> and Lovells Lane, South Sandwich, Falmouth were seal coat- <br /> ed. A portion of Monomoscoy, Meeting House, New Town seal <br /> coated. General maintenance, shoulder drainage, patching, <br /> graveling was done on all roads. Break down on expenditure <br /> of all roads as follows: <br /> APPROPRIATIONS <br /> Appropriation $10,100.00 <br /> Forestdale $313.16 <br /> Ashumet 96.80 <br /> Falmouth 1,056.10 <br /> Lovell Lane 384.60 <br /> Quashnet 1,085.91 <br /> Old Barnstable 725.77 <br />