My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/04/1971 Special Town Meeting
>
08/04/1971 Special Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 5:20:40 PM
Creation date
2/23/2021 4:26:17 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�i <br /> page 11 . . .Special 'down meeting Aug. 4/71 <br /> 'i <br /> K. D. O'Connell* We have a front end loader, but -,.,re do not have <br /> puncture proof tires on it® It has been used on the dump. It <br /> couldn' t be used each day. <br /> From the floors If the Hoard of Health hues a contractor he can' t <br /> be there each day either. <br /> K. D. O'Connell® Irte realize there are difficulties in this regard® <br /> Fron the floors I would like to ,nsk the Hoard of Health if a part- <br /> tune contractor would fill the requirments® <br /> Lashley: No. <br /> From the floors This is why I asked the question if gown equipment <br /> we already have could not be used® I think the sun of $20,000, <br /> `6,500, and. $26,000 is just the top of this iceberg. If this <br /> exnen;sive equipment is brought there will be the additional e penpQ <br /> to house and maintain it. It seems to me some other arrangement should <br /> be made to comply with State r gulatiohso Don' t we have 'down equipment <br /> than we 6otild use with more or less the same frequency as that of a <br /> outside contractor9 <br /> K. D. O'Connell: It depends on how much the Highway Dept. needs <br /> to use t As puce of equipment. <br /> From the floors I think we should know more about the ends and cuts <br /> of this thing. <br /> Henwa;y to Lashley* We would like to know what a contractor' s price <br /> mi ht be if he operates on the dump each day. <br /> ,F <br /> TQshleys Possibly $27,000. For a three year contract most dumps <br /> are paying $80,000. <br /> Mr. Fitz7,eraldz I move that article 8 and 9 be tabled and article <br /> 10 be voted as read® <br /> Moderators We can ' t do it that way. <br /> Fitz7 ralds I cant see why. <br />
The URL can be used to link to this page
Your browser does not support the video tag.