Laserfiche WebLink
3 <br /> Finance Committee <br /> Minutes <br /> March 4, 2021 <br /> Presentation from Town Manager: (continued) <br /> It was explained there are underlying circumstances as recommended by the Town's <br /> Comprehensive Water Resources Management Plan(CWRMP). This includes expenses and <br /> solutions associated to the comprehensive hybrid plan for all areas of Mashpee, with nitrogen <br /> credit addressing the three south-facing embayment's,Popponesset, Three Bays and Waquoit <br /> Bay. <br /> GHD, Inc. project engineers are expected to present 75% design and the Phase I cost estimate <br /> on March 15, 2021. The results of the cost estimate may differ from the forecast being given. <br /> Operations and maintenance in Phase I are expected to be contracted services and are considered <br /> separate from the infrastructure cost analysis. The projected cost is $1.2 million. However, <br /> there may be a start-up transition where additional costs may incur. The expense cost analysis <br /> would be further defined by the engineer and it is assumed the charges and rates would offset <br /> these costs when the plant is fully functional. <br /> It is projected the Town would secure principal forgiveness at 0% interest from the Clean Water <br /> State Revolving Fund(CWSRF) loan. It is expected the average subsidy of the CWSRF loan <br /> would be 3.3%for the Town of Mashpee. The payback of the loan would then be 3.3% less at a <br /> 0% interest rate. <br /> By receiving the CWSRF loan the Town qualifies for Cape Cod and Islands Water Protection <br /> Fund(CCIWPF) grant funding. It is projected the Town would receive 10% forgiveness or$5.1 <br /> million in the Phase I budget of$51.2 million. <br /> A requirement of the CWSRF loan is to adopt a Flow Neutral Bylaw for future and present <br /> wastewater treatment systems/sewer service areas. Compliance would maintain mandates <br /> associated to the 0%interest of the loan. Non-compliance would increase the loan to 2%, an <br /> average of$50 per year per taxpayer. The entire Town is expected to make payment for the <br /> infrastructure and piping associated to Phase I of the Wastewater Plan. <br /> With the adoption of the Flow Neutral Bylaw as it pertains to new development, a single-family <br /> residence may have (4)bedrooms by right on parcels of 40,000 square feet or less. On parcels <br /> greater than 40,000 square feet, a single-family residence may have(1)bedroom per 10,000 <br /> square feet of lot area by right. Existing development modifications for a single-family dwelling <br /> on a parcel of 40,000 square feet or less may increase the total number of bedrooms to (4)by <br /> right. On parcels over 40,000 square feet existing family dwellings may increase the number of <br /> bedrooms to (1) bedroom per 10,000 of lot area by right. <br /> Included in financial assumptions is the 2% WIIF which would assess $89 on an average home <br /> valued at approximately $489,000. A 3.25% increase is assumed yearly on the WIIF based on <br /> the levy amount. The Rooms Tax projected conservatively at$749,000 would earmark 75% of <br /> revenue for wastewater initiatives. <br />