My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/22/2021 BOARD OF SELECTMEN Minutes
>
02/22/2021 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 5:00:32 PM
Creation date
4/16/2021 10:29:56 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19 <br /> Board of Selectmen <br /> Minutes <br /> February 22, 2021 <br /> ANNUAL TOWN MEETING WARRANT <br /> Discussion and Approval of Draft#1 May 3 2021 Special and Annual Town Meeting Warrant Articles: <br /> PETITION ARTICLES (continued) <br /> Article <br /> To see if the Town will vote to amend §174-4, Enumeration of Districts by adding Solar Energy Systems <br /> Overlay District. <br /> Explanation:This article would create and establish a Solar Energy System Overlay District as enumerated in <br /> proposed Section 174-47.7. <br /> Article <br /> To see if the Town will vote to amend §174-5, Establishment of Zoning Map by adding §174-5 (H) as follows: <br /> Explanation:This Article is intended to define by reference to the Mashpee Assessor Fiscal Year 2021 tax <br /> maps,the land within the Solar Energy Systems Overlay District that should be attached to this zoning map. <br /> It was disclosed the Select Board previously determined to not create large overlay districts, and thus declined <br /> to place an article on the October warrant for this purpose. <br /> It was agreed the petitioner would be requested to attend the next Select Board Meeting to review the intent of <br /> this project and that a map would be included in the project proposal for additional review. It was also <br /> recommended the petitioner contact the abutters regarding this project. <br /> LIAISON REPORTS <br /> Sewer Commission: It was reported the project engineers of GHD, Inc. reviewed the wastewater plan at the last <br /> Sewer Commission meeting to continue on task to achieve 75% design to obtain cost assumptions and to <br /> mitigate the impacts to the surrounding areas. The amount of disruption should be minimal with double filtering <br /> and no open-air escape. <br /> The Sewer Commission voted in support to include the grinder pumps in the overall project. Details regarding <br /> costs would be provided in mid-March. <br /> Of note,two additional components to the project are being considered. This includes contract bidding to fully <br /> install solar panels on the building which would fulfill most or all electricity needs. In addition, cost <br /> comparisons are being studied for(8)underground treatment tanks. Initial construction requires two of the <br /> eight underground tanks to be installed. There may be a savings to install all of the tanks simultaneously. This <br /> would be decided upon when cost comparisons are received in mid-March. <br /> It was requested the project engineer GHD, Inc. provide the Town will a project schedule and list of what is <br /> required to be accomplished to meet project deadlines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.