Laserfiche WebLink
AMENDMENT NO.4 <br /> TOWN OF MASHPEE AND <br /> GHD INC. <br /> u PAGE 6 <br /> technical matters, then ENGINEER will promptly give written notice to OWNER and Contractor that <br /> ENGINEER will not provide a decision or interpretation. <br /> 14. Field Orders: Subject to any limitations in the Construction Contract Documents, ENGINEER may <br /> prepare and issue Field Orders requiring minor changes in the Work that do not impact cost or time. <br /> 15. Change Orders and Work Change Directives: Recommend Change Orders and Work Change <br /> Directives to OWNER, as appropriate, and prepare Change Orders and Work Change Directives as <br /> required. <br /> 16. Shop Drawings, Samples, and Other Submittals: Review and approve or take other appropriate action <br /> with respect to Shop Drawings, Samples, and other required Contractor submittals, but only for <br /> conformance with the information given in the Construction Contract Documents and compatibility with <br /> the design concept of the completed Project as a functioning whole as indicated by the Construction <br /> Contract Documents. Such reviews and approvals or other action will not extend to means, methods, <br /> techniques, sequences, or procedures of construction or to safety precautions and programs incident <br /> thereto. ENGINEER shall meet at periods'ideritified in the Construction Contract Documents. <br /> 17. Substitutes and "Or-equal": Evaluate and, determine the acceptability of substitute or "or-equal" <br /> materials and equipment proposed by Contractor, but subject to the provisions of Paragraph 2.02.A.2 <br /> of this Amendment No.4. <br /> 18. Inspections and Tests: <br /> a. Require such special inspections and test.of Contractor's work as deemed reasonably necessary, <br /> and receive and review all certificates of inspections, tests, and approvals required by Laws and <br /> Regulations or the Construction Contract Documents: ENGINEER's review of such certificates will <br /> be for the purpose of determining that the results certified,indicate compliance with the Construction <br /> Contract Documents and will not constitute an independent evaluation that the content or <br /> procedures of such inspections, tests, -or approvals comply with the requirements of the <br /> Construction Contract bocuments.,,ENGINEER shall be entitled to rely on the results of such <br /> nspectio'nsand tests. <br /> Contract with third-party materials testing firms as required for the three construction projects, as <br /> follows: <br /> Contract 1 <br /> o Special inspections associated with the new structures <br /> o:' Soils and asphalt material and compaction testing is NOT provided by GHD <br /> o Concrete testing is NOT provided by GHD <br /> • Contracts 2 and 3 <br /> o Soils and asphalt material and compaction testing <br /> o Concrete testing <br /> o Special inspections associated with the two new lift stations <br /> b. As deemed reasonably necessary, request that Contractor uncover Work that is to be inspected, <br /> tested, or approved. <br /> https://projects-northamaHca.ghd.com/sites/na04 03/proptownofmashpeasta/ProposalDocs/i 1229548-AGR-Amendment 4 Mashpee CPS.docx <br />