AMENDMENT NO.4 <br /> TOWN OF MASHPEE AND <br /> GHD INC. <br /> PAGE 8 <br /> 21. Contractor's Completion Documents: Receive from Contractor, review, and transmit to OWNER <br /> maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence <br /> of insurance required by the Construction Contract Documents, certificates of inspection, tests and <br /> approvals, and Shop Drawings, Samples, and other data approved as provided under Paragraph <br /> 1.02.A.16 Receive from Contractor, review, and transmit to OWNER the annotated record documents <br /> which are to be assembled by Contractor in accordance with the Construction Contract Documents to <br /> obtain final payment. The extent of ENGINEER's review of record documents shall be to check that <br /> Contractor has submitted all pages. <br /> 22. Substantial Completion: Promptly after notice from Contractor that Contractor considers the entire <br /> Work ready for its intended use, in company with OWNER and Contractor, visit the Site to review the <br /> Work and determine the status of completion. Follow the procedures in the Construction Contract <br /> regarding the preliminary certificate of Substantial Completion., punch list of items to be completed, <br /> OWNER's objections,notice to Contractor,and issuance of a final certificate of Substantial Completion. <br /> Assist OWNER regarding any remaining engineering or technical'matters affecting OWNER's use or <br /> occupancy of the Work following Substantial°Completion. <br /> 23. Other Tasks: Perform or provide the followirig other Construction Phase tasks or deliverables: <br /> a. SCADA: The SCADA system at the WRRF shall be provided. <br /> i. GHD's scope of work for this task shall include the following: <br /> 1.1: Deliverables: GHD will provide the following deliverables for the control systems: <br /> a. Complete and Annotated PLC Logic <br /> b. , ;Complete and Annotated Supervisory Software Development <br /> c ,'Specific Ancillary Software Programming <br /> d. 'Preliminary Testing <br /> e. Startup/Commissioning <br /> f. Software Training <br /> 1 2: PLC',L;ogic Development: GHD'Vwll develop the PLC programs for the complete control <br /> system as shown on the Contract'Documents. Including three PI-Cs at the wastewater <br /> treatment plant and two,at remote wastewater pumping stations: <br /> a. PLC-PTB(WRRF Pretreatment Building) <br /> b. PLC-PRB (WRRF Process Building) <br /> c.'' PLC-CFR(WRRF Process Building Chemical) <br /> d.' 'PLC-MNPS(Mashpee Neck Pumping Station) <br /> e. PLC-FRP,S (Falmouth Road WWPumping Station) <br /> The above PI-Cs will be programmed by GHD. The logic will be based on the control system <br /> descriptions developed by the project team. GHD will continue modifications of the control <br /> logic during the startup period based on information provided by the project team. The <br /> programming effort will be a dynamic effort, which expands to provide the facility a control <br /> system to satisfy the requirements necessary for plant automation. <br /> https://projects-northamedca.ghd.com/sites/na04 03/proptownofmashpeesta/ProposalDor-s/i 1229548-AGR-Amendment 4 Mashpee CPS.docx <br />