My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2021 SEWER COMMISSION Minutes
>
06/17/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 5:01:17 PM
Creation date
8/27/2021 12:38:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMENDMENT NO.4 <br /> TOWN OF MASHP E AND <br /> GHD INC. <br /> PAGE 11 <br /> iii. Incorporate OWNER-provided police detail invoices into the SRF Reimbursement requests. <br /> d. Coordination with Property Owners: <br /> i. Contracts 2 and 3:Work with Contractor to coordinate the property owners to determine final <br /> lateral stub locations and to address area access and other construction—related issues. <br /> e. Start-up, Training and Operations Services: <br /> i. Work with the OWNER and Contractor to plan for and implement start-up. Plan, oversee, <br /> and participate in the start-up of constructed improvements including the following systems: <br /> • Contract 1: <br /> • Influent Pump Station <br /> • Equalization Basins <br /> • Preliminary Treatment: '' <br /> • MBR/Secondary Treatment <br /> • Solids Handling <br /> • UV System <br /> • Effluent Beds'' <br /> • Odor Control <br /> • Generator <br /> i <br /> • HVAC' <br /> • Chemical Systems <br /> • Effluent Heat'Recovery <br /> . SCADA <br /> • Contract 3: <br /> • Ma`shpee Neck Pumping Station <br /> • Falmouth Road Pumping Station <br /> f. Town Presentations <br /> i. Prepare for and participate in monthly Sewer Commission meetings. Provide updates on the <br /> status of construction for each of the three construction contracts. Updates shall include the <br /> status of progress, budget, and schedule. Up to twenty-four (24) presentations are <br /> anticipated. <br /> 24. Provide assistance and coordination with the scheduling of pre-start-up and post-start-up training to the <br /> operators on new equipment and each new or modified system. <br /> a. Contract 1: New equipment and new systems. <br /> b. Contract 2 and 3: Low pressure system, gravity system, and force mains. <br /> htips://projects-northameNca.ghd.com/siles/na04_03/proptownofmashpeesta/ProposaiDocs/i1229548-AGR-Amendment 4 Mashpee CPS.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.